34
Unit Installation with Vertical Termination
due to its higher corrosion resistance. Continue
the height of the vent cap meets the minimum
vertical height must be increased.
7. Ensure vent is vertical and secure the base of
storm collar over the pipe section and seal
with a mastic.
8. Install the vertical termination cap by twist
locking it.
!
NOTE
the vent passes through must be enclosed.
Roof Pitch
Minimum Vent Height
Feet
Meters
2
0.61
over 7/12 to 8/12
2
0.61
over 8/12 to 9/12
2
0.61
over 9/12 to 10/12
2 ½
0.76
over 10/12 to 11/12
3 ¼
0.99
over 11/12 to 12/12
4
1.22
over 12/12 to 14/12
5
1.52
over 14/12 to 16/12
6
1.83
over 16/12 to 18/12
7
2.13
over 18/12 to 20/12
7 ½
2.29
over 20/12 to 21/12
8
2.44
cases. Increasing the vent height may solve the problem.
Pipe Length
Height
inches
mm
inches
mm
inches
mm
4 ¾
121
0
0
13 ¼
337
9
229
6
152
17 ½
445
11 ¼
286
9
229
19 ½
495
13 ¼
337
12
305
21 ¾
552
21 ¾
552
24
610
30 ¼
768
30 ¼
768
36
914
39
991
38
965
48
1219
47
1194
Vent
Height
See DuraVent or ICC manufacturer's guidelines for
minimum cutout dimensions or frame openings around
wall venting. Make sure clearances to combustible
material are maintained based on vent part used.
!
Cutout sizes vary according to the DuraVent or
ICC part number used.
Diagram 4
Summary of Contents for FMG3326F-LP
Page 1: ......
Page 9: ...9 FaberFires com Maintenance Log Service Date Notes ...
Page 19: ...19 FaberFires com Remote Control Instructions ...
Page 20: ...20 ...
Page 21: ...21 FaberFires com ...
Page 22: ...22 ...
Page 23: ...23 FaberFires com ...
Page 38: ...38 ...
Page 70: ...70 Operation Inspection ...
Page 78: ......