46
The necessary clearance for a mantel made of combustible
height. Use the following table and illustration for information on
mantel clearance requirements for mantels made of combustible
Mantel Clearance
A
B
C
D
Ref.
Height
Max. Depth
> 254 mm
No maximum
A
254 mm
305 mm
B
152 mm
152 mm
C
101 mm
101 mm
D
51 mm
25 mm
at every point from the origin of the heat release. You must also verify the sprinkler head sensor is set to the proper heat
building code to determine what temperature setting is relevant for your installation.
Clearance to Sprinkler
Vaulted ceilings can create a channel that funnels hot air directly towards a sprinkler head placed at the proper
Ceiling
Sprinkler Head
Fire stop
WARNING
Summary of Contents for FMG3326F-LP
Page 1: ......
Page 9: ...9 FaberFires com Maintenance Log Service Date Notes ...
Page 19: ...19 FaberFires com Remote Control Instructions ...
Page 20: ...20 ...
Page 21: ...21 FaberFires com ...
Page 22: ...22 ...
Page 23: ...23 FaberFires com ...
Page 38: ...38 ...
Page 70: ...70 Operation Inspection ...
Page 78: ......