5

a

b

a

b

a

b

b

a

c

a

xx°(3)

xx°(2)

xx°(1)

ENGLISH

By means of table 1 

(see white or grey boxes)

 choose the 

fixing hole on the rear bracket and install the fork (Fig. 7 
re. 

a

) by assembling it with the special pin supplied (Fig. 7 

re. 

b

).

2.

Install the encoder on the rear bracket by correctly engaging 
it on the pin then fix it with the screw and nut supplied (Fig. 
8 re. 

 

 

c

).

Slightly press the protection cover on the rear bracket to 
install it  (Fig. 9).
Assemble the operator and the rear bracket by means of 
the pin and nut supplied (Fig. 10 re. 

a

 -

 b

).

3.

4.

5.

Fig. 7

Fig. 9

3.3 INSTALLATION OF OPERATORS

Check  the  perfect  level  then  weld  the  rear  fitting  to  the 
pillar or fix it by means of suitable screws, dowels / threaded 
inserts. Observe the dimensions stated in Tab.1

 

(never cut 

the rear fitting; moreover it must be installed with the word 
"UP" facing up as shown in figure 6 re. 

a

).

1.

Fig. 8

Fig. 10

Fig. 11

Screw one-half of the thread of the front articulated joint on 
the operator rod and tighten the nut (Fig. 11 re. 

a

).

Unlock the operator according chapter 4.

If no external mechanical stop

 point at closure is present, 

you may use the stop point inside the operator. Therefore 
remove the rod completely up to its internal stop point.

If an external mechanical stop

 point at closure is present, 

remove the rod completely and then insert it 5 mm.

6.

7.

8.

9.

INSTALL THE BRACKET

 WITH THE WORD “UP”

 FACING UP

HOLE FOR
ENCODER

CABLE

ROUTING

Fig. 6

DO NOT TIGHTEN

THE NUT TOO

MUCH

www.metalines.com

[email protected]

Summary of Contents for S450 UK KIT-CBAC

Page 1: ...S450H www metalines com sales metalines com...

Page 2: ...12978 protect from the hazards caused by mechanical movements such as crushing entrapment and shearing hazards 17 Each installation should be fitted with at least one flashing light e g FAACLIGHT and...

Page 3: ...itable for automation Verify in particular that it is sufficiently strong and stiff and that dimensions and weight correspond to those stated in the technical specifications Verify the smooth and unif...

Page 4: ...a B ENGLISH ATTENTION do not cut for any reason the rear bracket Make reference to figures 4 and 5 and to table 1 to determine the installation position of the operator INSTALLATION DIMENSION B SEE FI...

Page 5: ...90 2 90 2 90 2 90 3 90 3 215 224 90 1 89 2 90 2 90 2 90 2 90 3 90 3 Z a 3 a 2 D1 a 1 3 2 1 TAB 2 B1 XXX XXXX D1 XXX 115 1 115 1 XXX 110 2 110 2 XXX 100 3 100 3 B1 50 75 100 85 1060 B1 D1 Z a ENGLISH...

Page 6: ...pillar or fix it by means of suitable screws dowels threaded inserts Observe the dimensions stated in Tab 1 never cut the rear fitting moreover it must be installed with the word UP facing up as shown...

Page 7: ...move the front articulated joint and insert on the rod the number of spacers required to reach the desired opening angle Fig 14 10 11 12 13 14 If an external mechanical stop point at closure is pre se...

Page 8: ...ent Leaf stationary DL 1 must always be ON to ensure the right connection between encoder and board DL 2 indicates the leaf where the encoder is installed If the encoder is installed on leaf 1 the DL...

Page 9: ...LEDS DL1 AND DL2 ARE ON WHEN THE MOTOR IS NOT IN OPERATION LEAF 1 TWO LEDS ON THROUGH THE BRACKET COVER OF LEAF 2 VERIFY THAT THE LED DL1 IS ON WHEN THE MOTOR IS NOT IN OPERATION LEAF 2 ONE LED ON Fi...

Page 10: ...it its seat Remove all spacers if present Fig 25 4 Tilt the operator upward as much as possible D o n o t f o r c e t h e r e a r f i t t i n g t o o m u c h 5 Supply the operator with power and move...

Page 11: ...ndbuch sind unverbindlich FAAC beh lt sich das Recht vor ohne die wesentlichen Eigenschaften dieses Ger tes zu ver ndern und ohne Verbindlichkeiten in Bezug auf die Neufassung der vorliegenden Anleitu...