
51 / 68
Ver. 1.1 - January 2017 - en-US
Installation
6.5.2.2
Attachment of the plinth
M
inimum role:
R
isks
P
pe
T
ools
M
aterials
A
nchor fastener M12
Shim
M12 nut
C
-profile
M
12 washer
M
12 grower
≥
10 cm
a
c
b
b
b
P
lace the plinth in the point designated for the
installation of the station, making sure that the
grooves end up inside the plinth itself
(a)
M
ark the support points with a pencil
(b)
Leave at least 10 cm between the
station and the wall behind it to allow
proper ventilation ( Position of
devices)
r
emove the plinth
(c)
a
b
D
rill holes at the points marked
(a)
I
nsert the screws in the holes
(b)
Summary of Contents for PARQUBE APS
Page 2: ......
Page 7: ...7 68 Ver 1 1 January 2017 en US Chapter 1 MANUAL INTRODUCTION ...
Page 10: ...10 68 Ver 1 1 January 2017 en US This page is intentionally left blank ...
Page 11: ...11 68 Ver 1 1 January 2017 en US Manual introduction Chapter 2 GENERAL CONDITIONS ...
Page 17: ...17 68 Ver 1 1 January 2017 en US Chapter 3 STORAGE AND HANDLING ...
Page 24: ...24 68 Ver 1 1 January 2017 en US This page is intentionally left blank ...
Page 25: ...25 68 Ver 1 1 January 2017 en US Chapter 4 PRODUCT DESCRIPTION ...
Page 36: ...36 68 Ver 1 1 January 2017 en US This page is intentionally left blank ...
Page 37: ...37 68 Ver 1 1 January 2017 en US Chapter 5 ACCESS TO THE PERIPHERAL ...
Page 42: ...42 68 Ver 1 1 January 2017 en US This page is intentionally left blank ...
Page 43: ...43 68 Ver 1 1 January 2017 en US Chapter 6 INSTALLATION ...
Page 60: ...60 68 Ver 1 1 January 2017 en US This page is intentionally left blank ...
Page 61: ...61 68 Ver 1 1 January 2017 en US Chapter 7 SETTINGS ...
Page 64: ...64 68 Ver 1 1 January 2017 en US This page is intentionally left blank ...
Page 65: ...65 68 Ver 1 1 January 2017 en US Chapter 8 DECLARATION OF CONFORMITY ...
Page 67: ...67 68 Ver 1 1 January 2017 en US This page is intentionally left blank ...
Page 68: ...HUB Parking Technology a Business Unit of the FAAC Group www hubparking com ...