![background image](http://html.mh-extra.com/html/faac/parqube-aps/parqube-aps_installation-manual_535623021.webp)
21 / 68
Ver. 1.1 - January 2017 - en-US
St
orage and handling
3.1.4. Unpacking
M
inimum role:
R
isks
P
pe
T
ools
U
npack the station at the place where it is to be
installed
C
ut the containment strapping
(a)
Beware of the "whip effect".
r
emove the top box
(a)
L
ift off the cardboard packaging
(b)
r
emove the cap from the station
(c)
C
heck that all the components of the delivery are
present and undamaged
(d)
D
ispose of all packaging materials,
(Packaging disposal)
Summary of Contents for PARQUBE APS
Page 2: ......
Page 7: ...7 68 Ver 1 1 January 2017 en US Chapter 1 MANUAL INTRODUCTION ...
Page 10: ...10 68 Ver 1 1 January 2017 en US This page is intentionally left blank ...
Page 11: ...11 68 Ver 1 1 January 2017 en US Manual introduction Chapter 2 GENERAL CONDITIONS ...
Page 17: ...17 68 Ver 1 1 January 2017 en US Chapter 3 STORAGE AND HANDLING ...
Page 24: ...24 68 Ver 1 1 January 2017 en US This page is intentionally left blank ...
Page 25: ...25 68 Ver 1 1 January 2017 en US Chapter 4 PRODUCT DESCRIPTION ...
Page 36: ...36 68 Ver 1 1 January 2017 en US This page is intentionally left blank ...
Page 37: ...37 68 Ver 1 1 January 2017 en US Chapter 5 ACCESS TO THE PERIPHERAL ...
Page 42: ...42 68 Ver 1 1 January 2017 en US This page is intentionally left blank ...
Page 43: ...43 68 Ver 1 1 January 2017 en US Chapter 6 INSTALLATION ...
Page 60: ...60 68 Ver 1 1 January 2017 en US This page is intentionally left blank ...
Page 61: ...61 68 Ver 1 1 January 2017 en US Chapter 7 SETTINGS ...
Page 64: ...64 68 Ver 1 1 January 2017 en US This page is intentionally left blank ...
Page 65: ...65 68 Ver 1 1 January 2017 en US Chapter 8 DECLARATION OF CONFORMITY ...
Page 67: ...67 68 Ver 1 1 January 2017 en US This page is intentionally left blank ...
Page 68: ...HUB Parking Technology a Business Unit of the FAAC Group www hubparking com ...