3.1.3. Reception
1
2
Pos Element
1
S
hock sensor - ShockWatch
2
Tilt sensor - TiltWatch
T
he packaging is provided with sensors which
indicate whether the product has been subjected
to shock or has been turned over during transport
or handling.
I
f one or both indicators
(1)
and
(2)
are red,
proceed as follows:
1. D
o not refuse delivery
2. Write on the document that the indicators are
red and then check if the content is damaged
3. I
f the content is damaged, leave it in the
original packaging and request an inspection
by the carrier within 3 days of delivery.
1
2
3
4
A
t the end of transport, the packaging must be
intact and free from:
▫ wet areas
(1)
;
▫ areas exposed to heat
(2)
▫ signs of tampering
(3)
;
▫ dents, signs of shocks, deformation or
breakage
(4)
.
Summary of Contents for PARQUBE APS
Page 2: ......
Page 7: ...7 68 Ver 1 1 January 2017 en US Chapter 1 MANUAL INTRODUCTION ...
Page 10: ...10 68 Ver 1 1 January 2017 en US This page is intentionally left blank ...
Page 11: ...11 68 Ver 1 1 January 2017 en US Manual introduction Chapter 2 GENERAL CONDITIONS ...
Page 17: ...17 68 Ver 1 1 January 2017 en US Chapter 3 STORAGE AND HANDLING ...
Page 24: ...24 68 Ver 1 1 January 2017 en US This page is intentionally left blank ...
Page 25: ...25 68 Ver 1 1 January 2017 en US Chapter 4 PRODUCT DESCRIPTION ...
Page 36: ...36 68 Ver 1 1 January 2017 en US This page is intentionally left blank ...
Page 37: ...37 68 Ver 1 1 January 2017 en US Chapter 5 ACCESS TO THE PERIPHERAL ...
Page 42: ...42 68 Ver 1 1 January 2017 en US This page is intentionally left blank ...
Page 43: ...43 68 Ver 1 1 January 2017 en US Chapter 6 INSTALLATION ...
Page 60: ...60 68 Ver 1 1 January 2017 en US This page is intentionally left blank ...
Page 61: ...61 68 Ver 1 1 January 2017 en US Chapter 7 SETTINGS ...
Page 64: ...64 68 Ver 1 1 January 2017 en US This page is intentionally left blank ...
Page 65: ...65 68 Ver 1 1 January 2017 en US Chapter 8 DECLARATION OF CONFORMITY ...
Page 67: ...67 68 Ver 1 1 January 2017 en US This page is intentionally left blank ...
Page 68: ...HUB Parking Technology a Business Unit of the FAAC Group www hubparking com ...