$
4. After the foundation box is mounted according to the previous page, it is time to run PVC for
power and drainage. Lay down a PVC tube with a diameter of 1.38”. This tube will be used
for power and will lead to the
control box. Lay a second tube to
drain off rain water from the box
to the nearest drain.
5. Set the foundation box in concrete.
1.38”
Summary of Contents for Estate Swing e-sU 2200 series
Page 1: ...Manufactured by...