4.3. MECHANICAL INSTALLATION
1) Assemble the securing corner plates and anti-vibration spac-
ers to the operator as shown in Fig. 8.
2) Open the operator cover using the supplied triangular cavity
key as in Fig.9.
The cover stays in open position by means of an appropriate
locking system.
3) Place the operator on the plate using the supplied washers
and nuts as in Fig.10.
When doing this, route the cables through the raceway in the
operator’s lower half-body.
To access Interface card 844, route the cables through the
appropriate holes (Fig.1. ref.11), using the supplied cable
grippers.
4) Adjust height of the feet and distance from gate, consulting
Fig.11.
5) Secure the gearmotor to the foundation plate, tightening the
nuts as shown in Fig.12.
6) Prepare the operator for manual operation as explained in
paragraph 7.
7) Remove and store the breather screw (Fig.13).
Fig. 11
Fig. 12
Fig. 9
Fig. 8
Fig. 10
4.4. INSTALLING THE RACK
4.4.1. STEEL RACK TO BE WELDED (Fig.14)
1) Fit the three threaded pawls on the
rack element, locating them in the
upper part of the slot. In this way,
play on the slot will accommodate
any adjustments that may be neces-
sary later on.
2) Manually place the leaf in closed
position.
3) Rest the first section of the rack level
on the pinion gear, and weld the threaded pawl on the gate
as shown in Fig.16.
4) Move the gate by hand, checking whether the rack rests on
the pinion gear, and weld the second and third pawl.
5) Position another rack element next to the previous one, using
a section of rack as in Fig.17, to synchronize the teeth of the
two elements.
6) Move the gate by hand and weld the three threaded pawls,
carrying on until you have covered the entire gate.
Fig. 14
Fig. 13
5 max
43
112 (
Z
16)
120 (
Z
20)
64
49
15 ÷
32