Figure 7. The layout of a sample gate system
Locate switches at least
10 ft from the gate
1 Operator
Wire Gauges for Given Voltage
2 Control
Panel
220 VAC
115 VAC
3 Photocell
A 2
×
18 AWG
A 2
×
18 AWG
4 Switch
B 4
×
14 AWG
B 4
×
14 AWG
5
Junction box (see text)
C 5
×
18 AWG
C 5
×
18 AWG
6 Reversing
edges
D 4
×
14 AWG up to 414 ft
D 3
×
14 AWG up to 130 ft
7 Gate
stops
3
×
10 AWG up to 340 ft
8 Switch
9
Wiring to main circuit breaker
I
NSTALLING
THE
455 D C
ONTROL
P
ANEL
Locate the control panel in the most convenient position
possible, considering the movement of the gate. Figure
7 shows a basic layout for a two-leaf gate with the 400
Operator.
Installing the control panel consists of the following
general steps:
•
Connecting the main power to the control
panel
•
Connecting the activating device
•
Connecting the operator to the control panel
•
Checking the direction of the motor's rotation
•
Connecting other devices to the control panel
•
Set operating modes
The installer is responsible for grounding the gate and
operator systems, for providing the main power breaker
switch, and for making sure that the entire gate system
meets all applicable electrical codes.
For the complete 455 D Control Panel Installation
Instructions, see pages 14—25 of this manual.