background image

T

HE

 455 D C

ONTROL

 P

ANEL

 

G

ENERAL

 D

ESCRIPTION

 

 

The FAAC 455 D control panel is used to operate the 
following models. 
 

 

Swing gate operators

400  

412 

402  

750 

422  

760 

 

Barrier gate operators: 

 

 

610/615

 

 
The 455 D programming controls the following: 

 

Operating logic

: A, S, E, EP, B, and C logics 

available. 

 

Reversing device behavior

: Choose whether a 

triggered reversing device during closing 

immediately reverses gate movement or stops 
the gate and reverses gate movement when no 
longer triggered. 

 

Torque or Pressure

: Force adjustment for the 

412 operator. Adjustable from 0 to 50. 

 
Caution

: For all hydraulic operators, the torque  

must

 be programmed to the maximum (50) 

setting. 

  

Pause time between opening and closing

adjustable from 0 to 240 seconds. 

 

O p e n i n g / C l o s i n g   t i m e

:   a d j u s t a b l e 

 

from 0 to 120 seconds. 
 

Leaf delay on closing

: adjustable from 0 to 4.1 

minutes. 

 
The 455 D control panel should be installed in an 

enclosure that is conveniently located as close as 
possible to the gate operator. All electrical 
connections from the control panel to the operator 

must be made in a weatherproof junction box. 
 
The 455 D control panel requires a single-phase 

power supply voltage (115 VAC [±10%] or 230 VAC 
[+6 or -10%], 50–60 Hz). The power supply should be 
protected by a 15 amp dedicated circuit breaker (not 

provided). 
 

The installer is responsible for grounding the 
operator system, for providing the main power 

breaker switch, and for making sure that the entire 
gate system meets all applicable electrical codes. 

The installer should refer to the installation manual 
for a given operator for more information

 

N

OTE

An installation is U.L. compliant only 

when you install the FAAC operators according 
to the UL325 standards. 

 
 

I

NSTALLING

 

THE

 455 D C

ONTROL

 

P

ANEL

 

 

Locate the control panel in the most convenient position 

possible, considering the movement of the gate.   
 
Installing the control panel consists of the following 

general steps: 
 

∗ 

Connecting the main power to the control 
panel  

∗ 

Connecting the activating device 

∗ 

Connecting the operator to the control panel 

∗ 

Checking the direction of the motor's rotation 

∗ 

Connecting other devices to the control panel 

∗ 

Set operating modes 

 
 

C

ONNECT

 

THE

 M

AIN

 P

OWER

 S

UPPLY

 

 

WARNING! 

Turn the main power off before you 

make any electrical connections or before 

programming. 

 

Wire the main power supply to control panel terminals 

in block J3 (see Figures 13 and 14). The installer is 
responsible for insuring that a separate, grounded 
circuit protected by a circuit breaker is between the 

control panel and the main power supply. All wiring 
should conform to applicable electrical codes, and all 
wiring and fittings should be weatherproof and/or 

suitable for burial. 
 
Connect the ground to the grounding terminal in block 

J3 and connect the power wires to the terminals labeled 
N (neutral) and L (line). 
 

N

OTE

:  

For a 230V system, a neutral is not 

needed.  Connect one 115V line to the L (Line) 
and a second 115V line to the N (Neutral).   

Page 14 

January,  200 4 

412 O pe rator And  

455 D  Control Panel I nst allatio n M anual   

T

HE

 455 D C

ONTROL

 P

ANEL

 I

NSTALLATION

 I

NSTRUCTIONS

 

Summary of Contents for 412 Compact

Page 1: ...l the Operator 7 Install the 455 D Control Panel 10 Exploded View 412 12 412 Parts List 13 The 455 D Control Panel General Description 14 Installing the 455 D Control Panel 14 Connect the Main Power S...

Page 2: ...affected by the size of the gate how often it is used and how fast the gate operates 2 The operator you choose to install on your gate must be designed for the type and size of your gate and for the...

Page 3: ...power before making any attempt to repair it 4 Do not attempt to impede the movement of the gate You may injure yourself as a result 5 This equipment may reach high temperatures during operation ther...

Page 4: ...aximum leaf swing deg 110 Thrust and traction3 ft lb Nm 0 294 0 400 0 235 0 320 Stroke in cm 11 3 8 29 Rod speed 4 in sec cm sec 3 4 1 9 5 8 1 6 Thermal cut out deg F deg C 284 140 Operator dimensions...

Page 5: ...s marked DX Be sure to install each on the proper gate leaf see Figure 2 2 Protective covers for the worm screw housing of the operator 1 Package of mounting hardware 2 Rear mounting brackets 2 Rear m...

Page 6: ...anism that precisely controls the force transmitted to the gate leaf through the 412 Operator The Manual Release mechanism is a key operated device that disengages or engages the worm screw drive of t...

Page 7: ...e where the operators are mounted The operator attached to the hinge on the left of the gate must be an SX model If the hinge is on the right side the DX model must be installed Installing the operato...

Page 8: ...front mounting bracket with the short pin and one snap ring on the bottom and one snap ring on the top see Figure 9 11 13 16 in 30 cm 4 in 10 cm 5 29 32 in 15 cm Figure 6 The required dimensions of th...

Page 9: ...Gate post or column Steel elbow A B C D F Centerline of gate leaf E Mounting Dimensions 90 deg Swing 110 deg Swing A 5 3 4 in 14 5 cm 4 7 8 in 12 5 cm B 5 3 4 in 14 5 cm 4 7 8 in 12 5 cm WARNING A an...

Page 10: ...OPERATOR COVER Once the operator is attached to the gate leaf you next prepare the cover for installation Caution If you did not correctly establish the orientation of the gate leaf and properly inst...

Page 11: ...d 455 D Control Panel Installation Manual 1 Operator Wire Gauges for Given Voltage 2 Control Panel 220 VAC 115 VAC 3 Photocell A 2 18 AWG A 2 18 AWG 4 Switch B 4 14 AWG B 4 14 AWG 5 Junction box see t...

Page 12: ...Page 12 January 2004 412 Operator And 455 D Control Panel Installation Manual The 412 Compact Operator...

Page 13: ...p Protective Cover SX 1 8 727147 End Cap Protective Cover DX 1 9 N A Nickel Plated Self Tapping Screw 3 5 x 9 5 mm 3 10 2705 Capacitor For 115 v 25 f 1 10 2707 Capacitor For 220 v 8 f 1 11 727216 Prot...

Page 14: ...that the entire gate system meets all applicable electrical codes The installer should refer to the installation manual for a given operator for more information NOTE An installation is U L compliant...

Page 15: ...e to 2 and the red wire to 3 Wire each leg of the capacitor supplied to terminals 2 3 Note If you want to delay the closing of one gate leaf in a two leaf gate design be sure to connect its operator t...

Page 16: ...in power and send an activating signal to the operator The gate leaf or leaves should open If a gate leaf closes then you need to turn off the main power and reverse the connection of the red and blac...

Page 17: ...e motors without a closed circuit between 11 14 The LED Indicators The nine light emitting diodes LEDs on the control panel can be used to check for the proper function of the devices attached to the...

Page 18: ...he delayed leaf closes at the end of the closing time opening and closing respectively are triggered Use the LEDs and the next table to determine if the accessory devices you have installed are operat...

Page 19: ...ev ices 14 9 C NO Rev ersing Photocells f or opening 1 2 1 2 3 4 5 17 13 19 14 17 Additional Reversing Devices TX RX 1 2 1 2 3 4 5 19 17 12 19 17 Additional Reversing Devices TX RX 1 2 19 12 17 15 Add...

Page 20: ...he value that can be modified with keys and When you reach the last function press the F key to exit the program and the display resumes showing the status of the inputs The table on page 21 shows the...

Page 21: ...ou sands from 0 to 99 thousand cy cles The displayed value is up dated as cycles proceed This func tion can be used to check use of the board or to exploit the Assistance Request function EXTRA WORK T...

Page 22: ...ay stops flashing LEARNING OF OPERATING TIMES WARNING During the learning procedure the safety devices are disabled Therefore any and all traffic must be avoided in the path of the gate leaf s NOTE Pr...

Page 23: ...and must be given to start the slow down phase When the gate operator reaches its positive stop the operator will automatically shut off An open command must be given to start closing gate operator 2...

Page 24: ...g Reversing Device s Warning Light Closed Opens both leaves and closes them after pause time Opens single leaf connected to Motor 1 and closes it after pause time No effect No effect No effect Off Ope...

Page 25: ...s in hibited No effect opening is inhibited No effect opening is inhibited Off Opening Stops Stops Stops Stops gate closes when reversing device no longer trig gered No effect On Opened Closes both le...

Page 26: ...directions before the automatic operator is installed An automatic operator should be installed on the inside of the property fence line Do not install the operator on the public side of the property...

Page 27: ...OPENS BUT DOES NOT CLOSE SOLUTION Make sure you have selected the desired operating mode Verify that the reversing devices are working properly FSWOP and FSWCL should be illuminated except when a rev...

Page 28: ...rdance with FAAC International Inc s or FAAC S p A s instructions or has been operated under conditions more severe than or otherwise exceeding those set forth in the specifications for such product s...

Reviews: