STIRLING SERIES
26
3.
Peg out all your walls using the d-rings that are positioned around the perimeter
4.
If you are putting the PVC floor in, this is the time to do it, once it is all pegged out, this simply velcros on and
thanks to that PVC flap there is no chance of water getting in
Getting a mate to put pressure on the
outside while you fasten the Velcro will
make the job much simpler
SITE POWER
To use site power, you will require a 15A power lead connected to a 15A inlet (figure 1). In the event a 15A inlet is unavailable
you will need a conversion box that will step up from 10A to 15A with a safety switch. Never leave power leads coiled when
in use, lay the lead out back and forward in a manner that won’t be a trip hazard or risk damage to the lead.
Figure 1
This job is much easier with the help
of a friend
Pegging out the walls will help keep
them quiet if it gets windy, as well as
adding strength to the structure
Lay out your walls to begin with