Page 40 of 74
4.9.12.
Insert adjustable elbows into the open ramp handrail, the Bolt-On Stub Rail and the
open ends of the welded handrail extension (FIG. 4.20).
4.9.13.
Align the adjustable elbows and measure and cut the 1-1/2” diameter handrail tubes
connecting the ramp handrail and Bolt-On Stub Rail to the handrail extension.
Measure both upper and lower gaps because they could be different and cut tubes
accordingly. The procedure for installing the 1-1/2” diameter handrail tubes and
adjustable elbows is the same as the installing the closure top rail, refer ‘CLOSURES’
section.
4.9.14.
FIG. 4.20 shows the completed connection.
4.9.15.
Make sure all fasteners on both sides are tightened securely.
FIG. 4.20
Summary of Contents for PATHWAY 3G SS06VP
Page 15: ...Page 15 of 74 FIG 2 6 FIG 2 7...
Page 35: ...Page 35 of 74 FIG 4 12 FIG 4 13...
Page 36: ...Page 36 of 74 FIG 4 14 FIG 4 15...
Page 46: ...Page 46 of 74 FIG 5 5...