4.3.
FIELD CONVERT TWO-LINE RAMP HANDRAILS TO VERTICAL PICKETS
4.3.1.
Remove the Two-Line handrail from the ramp (if installed) then remove the lower rail
(FIG. 4.4).
4.3.2.
Install the vertical pickets into the two uppermost and lowermost holes in the ramp
handrail posts using the provided 5/16”-18 x 2-1/4” long hex bolts and 5/16” flat
washers.
It is strongly recommended that the bolts be assembled loosely and not fully
tightened until all four have been installed and the handrail has been installed
on the ramp.
4.3.3.
Install (or reinstall) the handrail on the ramp and connect the ramp handrails per
‘HANDRAILS’ section.