Chapter 4: Preinstallation checklist
Before you install the VSP 8000 Series, make sure that you complete the tasks in the preinstallation
checklist.
No.
Task
Description
1.
Review the technical specification for
the switch. Make sure that the area
where you install the switch and where
it will operate meet the requirements.
For the physical, electrical, and environmental
specifications, see
page 34.
2.
Verify the power supply unit (PSU)
specifications. Optionally order a
redundant PSU to provide redundancy
and load sharing.
AC power supply specifications
on
page 75 or
DC power supply specifications
page 80.
3.
Make sure that you have the following
tools and cables:
• Phillips #2 screwdriver
• RJ-45 console port cable
• ESD cable
Cable requirements for the VSP 8000
on page 71.
4.
Unpack the equipment.
Observe ESD precautions when you unpack
the equipment. See
page 33
5.
Verify the contents of the shipped
package.
on page 36 for a
description of the components that are
provided with the switch. If any components
are missing, contact Extreme Networks
support.
6.
Make sure that the power cord has the
correct country-specific termination.
7.
Prepare the rack.
Ensure that there is enough rack space to
accommodate a 2RU switch (8.8 cm).
Ensure that the rack is bolted to the floor and
braced if necessary.
Ensure that the rack is grounded to the same
grounding electrode used by the power service
in the area. The ground path must be
Table continues…