Chapter 5: Installing the VSP 4450GTX-HT-
PWR+
Installation checklist
Use this checklist to install the VSP 4450GTX-HT-PWR+.
No.
Task
Description
1.
Install the VSP 4450GTX-HT-PWR+.
You can install the switch in two ways:
•
Installing the Virtual Services Platform 4000
on a table or shelf
on page 21
•
Installing the Virtual Services Platform 4000
in an equipment rack
2.
Install the primary or redundant
power supply.
Important:
A combination of AC-input and
DC-input power supplies in the
same chassis is not supported.
For the procedure to install power supply, see
Installing the VSP 4000 Series PWR power
supply
3.
Check the LEDs to verify the
installation.
For a description of the LEDs, see
Emitting Diode (LED) on VSP 4000
on
page 32.
Installation fundamentals
The following section describes the installation fundamentals for the VSP 4450GTX-HT-PWR+
model.
VSP 4450GTX-HT-PWR+ model
The VSP 4450GTX-HT-PWR+ model consists of:
1. 48 10/100/1000 Mbps RJ45 ports with PoE+
Table continues…
August 2018
Installing the Virtual Services Platform 4450GTX-HT-PWR+
16