![Extreme Networks E4G-200 Installation Manual Download Page 54](http://html1.mh-extra.com/html/extreme-networks/e4g-200/e4g-200_installation-manual_2454532054.webp)
3 Identify the grounding point on the power supply (shown in the figures below).
4 Insert a 6-32 UNC screw (provided) through the ring terminal and into the grounding point on the
power supply.
See the following figures.
1
2
Figure 36: Connecting the Ground Cable (Model 10933)
1 = Grounding point
2 = Ground cable
Figure 37: Connecting the Ground Cable (Model 10934A)
1 = Grounding point
2 = Ground cable
5 Tighten the screw to 12.6 pound-inches (1.42 Newton-meters).
6 Connect the other end of the cable to a known reliable earth ground point at your site.
Installing an E4G Series Router
E4G Routers Hardware Installation Guide
54