
Getting Started with Your High Performance Power Meter
10
IQS-1700
Inserting and Removing Test Modules
To insert a module into the controller or expansion unit:
1.
Exit IQS Manager and turn off all your units.
2.
Remove the protective cover from the desired unused module slot.
2a.
Pull the retaining screw knob firmly towards you and release the
bottom of the cover.
2b.
Gently pull the top of the protective cover downwards, to remove
it from the unit grooves.
3.
Position the module so that its front panel is facing you and the top and
bottom protruding edges are to your right.
Retaining screw
knob
Protective cover
2b
2a
Summary of Contents for IQS-1700
Page 1: ...User Guide High Performance Power Meter and Optical Head for IQS 600 IQS 1700...
Page 5: ...Contents High Performance Power Meter v Index 189...
Page 8: ......
Page 14: ......
Page 16: ......
Page 44: ......
Page 64: ......
Page 96: ......
Page 114: ......
Page 196: ......