
METALJET D2+
INSTALLATION
Revision 19, November 2016
Page 4-7
Figure 4-5.
The six M6-threaded holes are spaced according to this image (the electron gun/x-ray head seen
from below).
Mount the x-ray system controller and the x-ray high-voltage controller
properly into a 19” rack
located close to the electron gun/x-ray head and the pump box.
Figure 4-6.
Use the side br
ackets on the front of the pump box to attach the pump box to a 19” rack.