ES2030 SV
Info
5
Info key
The information key is used to display various
information and values. Only the service
telephone number can be changed using the
info key.
If the info key is pressed during programming,
the full texts of some abbreviated texts are
shown in the LCD display.
Flushing
The following values are shown :
Top right : Flush time in seconds
Bottom left : quantity of water remaining
before flushing
Bottom right : quantity of water between two
flushes.
NOTE: This display shown only if the flushing
function is selected (see program step 15).
Regeneration time
The total time for a regeneration cycle is
shown.
Regeneration restrictions
NoReg 16:00 – 18:00
If “delayed regeneration” was selected during
programming at step 6, the period in which no
regeneration is to occur is shown.
Otherwise “NoReg ----“ is displayed.
IntRg 72
If “interval start” was selected during
programming at step 7, the time interval in
hours is shown.
Otherwise “IntRg --“ is displayed.
MinRg 4
If a “minimum regeneration distance” was
selected during programming at step 8, the
time interval in hours is shown.
Otherwise “MinRg --“ is displayed.
Additional program
Bottom left : the starting point of the additional
program is shown.
Bottom right : the start time entered is shown
or the time remaining if the additional
program is currently running.
If phase ‘0’ is displayed, the additional program
will first run for its full time, followed by the
regeneration program.
If phase ‘E’ is displayed the regeneration
program will first run completely, then the
additional program.
NOTE: If the additional program function was
not selected during programming at step 14,
“no additional program” will be displayed. If the
IF card is not fitted this display will be omitted.
Filter capacity
The water quantity delivered by a filter
between two regenerations is shown. In the
case of ion exchangers, the calculation is
always carried out using the currently entered
values for filter capacity and the supply water
hardness.
NoReg16:00-18:00
IntRg72 MinRg4
Additional prog.
Phase: 2 20
Unit capacity
100m3
Flushing
500l 500l 20s
info
Regen.time
Σ
95m rest.0m