HPS-C - TS operating instructions
Page 2 / 32
Safety instructions:
Before working on the plant, ensure it is off-circuit. Unit switch OFF and disconnect mains plug.
Connection, repair and maintenance work may only be carried out by qualified skilled personnel.
Before putting into service the system is to be inspected in accordance with DIN EN 60204 – 1 (11/1998 - Safety of
machinery - electrical equipment) and the generally recognised rules of sound engineering practice. The connected
components can become very hot. Appropriate precautionary measures are to taken when putting into service and during
operation.
Scope:
This EWIKON control system can be used to operate EWIKON hotrunner systems in dry rooms in industry.