EVCO S.p.A.
EVXV 800 range | Installer manual ver. 1.2 | Code 144XV800E124
page 35 of 66
r3
-50.0
99.0
°C/°F (1)
3.0
3.0
temperature-controlled blast chilling end time
temperature; also end temperature of the
temperature-controlled soft deep freezing
phase (temperature detected by the needle
probe); also see parameter r5
r4
-50.0
99.0
°C/°F (1)
-18.0
-18.0
temperature-controlled deep freezing end
temperature (temperature detected by the
needle probe); also see parameter r6
r5
1
500
min
90
90
maximum duration of temperature-controlled
blast chilling; also see parameter r3
r6
1
500
min
240
240
maximum duration of temperature-controlled
deep freezing; see parameter r4 also
r7
-50.0
99.0
°C/°F (1)
0.0
0.0
work set-point during blast chilling; also work
set-point during the soft deep freezing phase
(cabinet temperature); also see parameter r0
r8
-50.0
99.0
°C/°F (1)
-40.0
-40.0
work set-point during deep freezing (cabinet
temperature); also see parameter r0
r9
-50.0
99.0
°C/°F (1)
-20.0
-20.0
work set-point during blast chilling hard
phase
(cabinet
temperature);
also
see
parameter r0
r10
-50.0
99.0
°C/°F (1)
2.0
2.0
work set-point during post blast chilling
storage (cabinet temperature); also see
parameter r0
r11
-50.0
99.0
°C/°F (1)
-20.0
-20.0
work set-point during post deep freezing
storage (cabinet temperature); also see
parameter r0
r12
-50.0
99.0
°C/°F (1)
5.0
5.0
work set-point during pre-cooling (cabinet
temperature); also see parameter r0
r13
-50.0
99.0
°C/°F (1)
15.0
15.0
end
temperature
of
the
temperature-
controlled
hard
blast
chilling
phase
(temperature detected by the needle probe)