
Page 34/34
Switch ON circuit breaker D9 and close the door.
Verify that the time displayed at the screen is correct
and that the indicator lights for Signal connection and
server connection are functioning correctly.
If the indicators are not present (lit), verify the presence
of the SIM card. Validate (if present) that the SIM car is
correctly inserted. Also validate the presence and
connection of the aerial unit.
Verify that all the LED indicators are lit in green a there
is not any abnormal noise.
Test a normal client operation of the unit using a badge.
Note any modifications undertaken during the
commissioning (disconnecting earth cable,
replacement of the SO-DIMM…):
Validation location
Date
Certified Partner
Signature and stamp
Summary of Contents for Troniq
Page 1: ...D000782AA6 EVBox Troniq Installation Manual ...
Page 27: ...Page 27 34 8 APPENDIX 3 DIMENSIONS Charger dimensions without Auxiliary power cabinet APC ...
Page 28: ...Page 28 34 Charger dimensions with Auxiliary power cabinet APC ...
Page 29: ...Page 29 34 9 APPENDIX 4 CONNECTION TERMINALS DETAILS POWER AND COMMUNICATION ...