background image

EXP120K1-HT 120KW DC Charger

Configuration:

CCS2

CHAdeMO

AC tipo 2

Component

Description

Charge controller

IMMSU-D charging cont PLC cont insulation detector

Upper controller

IMMU2

Power module

REG75030G or REG50040G – optional configuration: 1~8 pcs

DC charging gun

200A CCS-2  / 125A CHAdeMO

AC charging gun

32A type 2 AC

DC power distribution

Standard system 120KW.
The positive and negative DC output are provide with NO contractors and fuse protection. 
The charger module has a built-in discharge circuit.

AC connector distribution

AC connector breaker and contactor, type B RCD (opcional)

Temperature control system

Heat exchange system

Card reader

RFID

Metering

2 DC energy meter and 1 AC energy meter

HMI

7 inch TFT touch screen display and 5 LED indicators

Módem wireless LTE

1   wireless   communication   (   optional,   insert   the   LTE   modem   card   into   IMMU2   upper
controller), 1 LAN

1.3  Technical parameters

Parameter

Description

Condiciones
ambientales

Operating temperature

1

-20°C~+45°C

Transportation / storage temperature

-40°C~+70°C

Relative humidity

5%RH~95%RH (with condensation)

Atmospheric pressure

80KPa~110KPa

Overvoltage category

II

Altitude

2000 m

Impact resistante

The impact resistance is 20J (5Kg, 0.4m). After the impact
the performance must not be affected. Make sure that the
IP class has not been affected, check the door fixing point
are not damaged and the internal components are not in
contact with any parts.

Mechanical
parameters

Dimensions (W × H ×D)

700 x 1750 x 760

mm

Weight (kg)

210Kg   (without   power   module),   power   module   weight
11kg each.

Note 1:

 The DC charger provides full output power up to 45ºC, output power decrease 5% above 45ºC.

The protection level of the DC chergar is IP65. But for charging safety it should not be used during rain or snow if water can
reach the charger connector.

EV Vision – Porto – Portugal – 

www.ev-vision.com

 – Support service: (+351) 229 999 230

All rights reserved. This manual may be changed without prior notice. - V 1.0 – 2019/08/10 – Pag. 7 de 25

Summary of Contents for EXP120K1-HT

Page 1: ......

Page 2: ...ate 2019 08 07 BOM 201040117 EXP120K1 HT Power configurations 30KW with 15KW increment up to 120KW EV Vision Porto Portugal www ev vision com Support service 351 229 999 230 All rights reserved This m...

Page 3: ...s equipment must be qualified to work with high DC voltage up to 750 Vdc and three phase AC voltage up to 500 Vac It is stricly forbidden to wear watches metal bracelets rings or other electrically co...

Page 4: ...ld be paid to planning cable routing before any installation work Insulations tools must be used During the work care should be taken to keep hands arms tools and other objects away from high voltage...

Page 5: ...Power cables connection 11 2 4 Power module installation 12 2 5 Configure power module 13 2 6 Power ON process 13 Chapter 3 Operating 14 3 1 LCD screen and user interface 14 3 2 Select system languag...

Page 6: ...ing system is composed of DC and AC charge guns The system may be installed outdoors but for safety reasons it should not be used during rain or snow as water may reach the chergar gun connector The s...

Page 7: ...3 Technical parameters Parameter Description Condiciones ambientales Operating temperature1 20 C 45 C Transportation storage temperature 40 C 70 C Relative humidity 5 RH 95 RH with condensation Atmosp...

Page 8: ...k os at least 10 seconds must be given before reconnecting it Care should be taken when replacing the module inserting it slowly to avoid mechanical damage to the pins that make the module contact to...

Page 9: ...splay with simple interface Various ways of cherging automatic charge time charge fee charge charge rate power charge and charge Internal high precision DC energy meter LAN and inner LTE wireless comm...

Page 10: ...ing RVVZ type cables as AC cables with the rated voltage of 550 750 Vac or higher and a minimum temperature of 70 C Technicians users determine a sectional area of the charger input and output cables...

Page 11: ...to main breaker 2 check all switch in the system are off status System main breaker AC output breaker aux power input braker 3 Plug in the power modules as needes If have empty slots must use panel t...

Page 12: ...movements when placing or removing them After removing a module you should wait 10 seconds minimum before you can perform this operation Since the system is built for configurable output power inside...

Page 13: ...lting in abnormal charging 4G Wireless router modem installation The system is equipped with technology that supports 3G 4G wireless communication Customers can connect their local SIM card and 3G 4G...

Page 14: ...stol you want to use by clicking the corresponding READY button Note If we configure the display interface parameter set Charger system local authorization enabled and activate afterclicking on the RE...

Page 15: ...by kWh or automatic According to your choise then in the next interface you will have to enter the desired values In automatic mode the parameters are according to EV loading requirements EV Vision Po...

Page 16: ...XP120K1 HT 120KW DC Charger EV Vision Porto Portugal www ev vision com Support service 351 229 999 230 All rights reserved This manual may be changed without prior notice V 1 0 2019 08 10 Pag 16 de 25...

Page 17: ...need to wait for charging when you reach the end you will need to re pass the RFID cardo or click CANCEL to interrupt the charging process If you are in OTP mode you must re enter the password After...

Page 18: ...the language setting menu Click on the icon to enter information menu we can get system information active alarms and billing records EV Vision Porto Portugal www ev vision com Support service 351 22...

Page 19: ...ce For this you need to enter the password to this menu This information is for service technicians to have access the user does not need this eccess EV Vision Porto Portugal www ev vision com Support...

Page 20: ...XP120K1 HT 120KW DC Charger EV Vision Porto Portugal www ev vision com Support service 351 229 999 230 All rights reserved This manual may be changed without prior notice V 1 0 2019 08 10 Pag 20 de 25...

Page 21: ...ress In Parameters Charger system Charger ID you need to enter the correct charger ID After entering the parameters the loader will connect to the OCPP server automatically after doing so the OCPP ico...

Page 22: ...min PCI LTE card and the local SIM card the settings on the LCD are the same as wired settings Attention The LTE may differ depending on the sountry in wuich the charger is installed before using this...

Page 23: ...in its place then go to Settings under Manual Control Load system System restart software and wait for the update to be performed automatically At the end remove the Micro SD card To enter the Passwo...

Page 24: ...se it is necessary to construct a cement base scale the dimensions of the base to the dimensions of the loader base see drawing above and be 100 to 150 mm high above the ground level For wiring they w...

Page 25: ...KW DC Charger Appendix 2 Schematic diagram EV Vision Porto Portugal www ev vision com Support service 351 229 999 230 All rights reserved This manual may be changed without prior notice V 1 0 2019 08...

Reviews: