EXP120K1-HT 120KW DC Charger
Appendix 1 – Engineering and technical parameters
The DC charger has front, left and right doors for easy maintenance work and access to power modules. Should
be allowed 150 cm of free space in the door access, this same distance will also prevent the hot air that came inside the
equipment from ventilation goes back, optimizing the thermal dissipation.
To avoid water accumulation in the loader base it is necessary to construct a cement base, scale the dimensions
of the base to the dimensions of the loader base ( see drawing above ) and be 100 to 150 mm high above the ground
level.
For wiring, they will have to pass through a pipe embdded in this cement base and he have to be 300mm more,
the pipe need to be at least 55mm in diameter and be placed next to the cable entry connection bar ( interior front door ),
for a good passage of the entire wiring.
EV Vision – Porto – Portugal –
www.ev-vision.com
– Support service: (+351) 229 999 230
All rights reserved. This manual may be changed without prior notice. - V 1.0 – 2019/08/10 – Pag. 24 de 25
Summary of Contents for EXP120K1-HT
Page 1: ......