Aquafilter
E9_Next_Ing_rev03 – 10/10/2018
49
E9 NEXT
b) Test planning
It gives the possibility of setting test execution intervals (Bowie & Dick, Helix, Vacuum).
After the expiry of the set interval, when the autoclave is switched on, the user is reminded to execute the
required test.
To activate this function proceed as indicated in the figure
7.9
LONG PERIODS OF INACTIVITY
1. Disconnect the unit from the mains supply.
2. Empty the tanks (chap. 6.7 "Tanks: Instructions for filling and draining").
3. Leave the door ajar.
4. Cover the unit with the polyethylene hood supplied with the unit, to protect it from humidity and dust.