Aquafilter
E9_Next_Ing_rev03 – 10/10/2018
24
E9 NEXT
6.6
INSTALLATION MENU
The first time that the unit is turned on using the ON-OFF button, the LCD screen comes on and shows the
following welcome message. This message stays on the screen for a few seconds, until the machine is ready
to be used. After a few seconds, required to load the process controller, the language selection screen will
appear. After selecting the language, the installation screen will appear.
Touch this icon to confirm the installation of the unit, the date and the time displayed on the
screen.
Touch this icon to exit the unit installation procedure. The installation screen will appear again the
next time the unit is switched on.
6.7
TANKS: INSTRUCTIONS FOR FILLING AND DRAINING
The unit features
two separate tanks
: one for the clean water required for the cycles, and one for the used
water that is collected at the end of the cycles. Both tanks are connected with drain valves.
Filling with distilled water for the first time
1. If a cycle is run and the water in the clean water tank does not reach the minimum level, the following icon
appears on the display:
2. Open the plug in the upper cover, fit the supplied funnel into the hole (1 in Fig. 6.8-1) and pour in a
quantity of distilled water as indicated in chap. 5.3 “Technical data”; never exceed the level indicated with
the word MAX in the water filling hole. Water can also be poured in through the deionizer (optional,
Appendix 10). To install this optional, consult the respective “Aquafilter” instruction manual supplied with
the deionizer.