14
www.eta.co.at
Empty the ash box
Inspect the integrity of the ash box seals on the boiler,
replace them if necessary.
Fig. 4-4: Seals
Attaching the ash box to the boiler
Reattach the cover of the ash box and secure with the
fasteners. Push the ash box over the connection on
the boiler and attach it to the boiler with the locking
lever.
Fig. 4-5: Locking lever
Switching on the boiler
Switch the boiler back on with the On/Off
switch.
Summary of Contents for PelletsCompact 20-32 kW
Page 1: ...2017 04 19 EN 0000000282 V 003 3 38 1 1910 93108 002 PelletsCompact 20 32 kW Operation...
Page 27: ...ETAtouch controller Getting to know the control system 27...
Page 31: ...ETAtouch controller Boiler function block PelletsCompact 20 32 kW 31...
Page 41: ...ETAtouch controller Buffer function block 41...
Page 45: ...ETAtouch controller Hot water tank function block 45...
Page 49: ...ETAtouch controller Fresh water module function block 49...
Page 63: ...ETAtouch controller Solar function block 63...
Page 67: ...ETAtouch controller Pellet store function block 67...
Page 74: ...www eta co at...
Page 75: ......
Page 76: ...www eta co at www eta co at downloads DOWNLOAD...