26
www.eta.co.at
Every 6,000 hours / 2 years
Cleaning and maintenance
2.5
Every 6,000 hours / 2 years
WARNING!
The following activities may only be performed by
qualified specialist personnel.
If you carry out these activities without the correspond-
ing specialist training, and above all without the
required experience, safe operation is no longer
guaranteed. The resulting defects and consequential
damage are excluded from the guarantee and
warranty.
Equally an incorrect performance of these activities
can lead to serious injuries.
Before this maintenance, perform all steps for the
preceding maintenance intervals
Before this maintenance, all steps for the
preceding maintenance intervals must be
performed.
Stop heating
End the boiler's heating mode with the On/Off switch
in the boiler overview window. The boiler
performs an ember burnout and then changes to
[Switched off] mode. Press the [De-ash]
button to
make the boiler perform a final de-ashing.
Switch off boiler via mains switch
WARNING!
Switch off the electricity to the boiler via the mains
switch. This prevents injuries caused by switching
the boiler on inadvertently.
WARNING!
Burns caused by hot parts
Even after the boiler has been switched off,
there will still be a danger of burns caused
by the cleaning and maintenance covers of
the combustion chamber and the heat
exchanger, and by the combustion chamber door.
These parts cool off more slowly, so they may still be
hot.
Allow the boiler cool off long enough, or wear
appropriate protective clothing.
Clean the upper area of the heat exchanger
Remove and detach the rail by loosening both nuts.
Fig. 2-55: Rail
Loosen the screws on the cyclone tubes and carefully
remove the cyclone tubes from the boiler.
Fig. 2-56: Cyclone tubes
Loosen the screws to detach the cover.
Fig. 2-57: Cover