Pellet store
Tilted floor
77
Only explosion-proof electrical installations
DANGER!
No electrical equipment such as switches, lights,
junction boxes, etc. may be present in the pellet
store.
Unavoidable installations must be airtight and
moisture-proof to protect against explosions, and
in the flight path of pellets they must be protected
against damage. Existing junction boxes that
cannot be installed elsewhere should at least be
filled in with foam to seal all exposed live parts.
13.6
Tilted floor
A tilted floor is needed
The pellet store must have a floor with 40° tilt to ensure
that all pellets in the store can be extracted. This
applies for systems with conveyor screws as well as
for suction heads.
Construction of tilted floor for pellet store
For the tilted floor, three-ply concrete formwork panels
27 mm thick have proven effective. Unplaned wooden
boards 25 mm thick with a smooth plastic-laminated
surface can also be used.
The tilted floor should be flush with the enclosing
walls so that no pellets can fall into the empty
space. However, the support frame itself may not lean
against the walls since they may not have the strength
to resist the forces involved.
Fig. 13-7: Tilted floor design for discharge screw
1
Formwork panel
2
Filling nozzle
3
Back air nozzle
4
Support span
Summary of Contents for 13180 LP-D
Page 1: ...2020 04 21 EN 0000000475 V 006 5402 00 939091 002 Pellet boiler ePE K 180 240 kW Installation ...
Page 33: ...Buffer storage tank Connection between multiple buffer storage tanks 33 ...
Page 55: ...Installation Network connection 55 ...
Page 61: ...Electrical connections Overview of circuit boards 61 ...
Page 65: ...Electrical connections Circuit board HA C5 65 ...
Page 85: ......
Page 86: ...www eta co at ...
Page 87: ......
Page 88: ...www eta co at www eta co at downloads DOWNLOAD ...