
Buffer storage tank
Hydraulic integration
29
With hot water tank
1
Boiler flow, heating circuits, hot water tank, oil/gas
boiler
2
Temperature sensor [Sensor 1 (upper)]
3
Oil/gas boiler return
4
Temperature sensor [Sensor 2]
5
Hot water tank return
6
Boiler, heating circuits return
7
Temperature sensor [Sensor 3]
The temperature sensor [Sensor 3] must always
be positioned just above the lowest return
connection.
This is also important for buffers from third parties so
that they are not positioned beneath the lowest return
connection.
With fresh water module
1
Fresh water module flow
2
Boiler, heating circuits, oil/gas boiler flow
3
Temperature sensor [Sensor 1 (upper)]
4
Oil/gas boiler return
5
Temperature sensor [Sensor 2]
6
High-temperature circuits return
7
Temperature sensor [Sensor 3]
8
Fresh water module return
9
Boiler, low-temperature circuit return
Summary of Contents for 13180 LP-D
Page 1: ...2020 04 21 EN 0000000475 V 006 5402 00 939091 002 Pellet boiler ePE K 180 240 kW Installation ...
Page 33: ...Buffer storage tank Connection between multiple buffer storage tanks 33 ...
Page 55: ...Installation Network connection 55 ...
Page 61: ...Electrical connections Overview of circuit boards 61 ...
Page 65: ...Electrical connections Circuit board HA C5 65 ...
Page 85: ......
Page 86: ...www eta co at ...
Page 87: ......
Page 88: ...www eta co at www eta co at downloads DOWNLOAD ...