Installation
Ash box
47
Fig. 9-29: Cover
9.7
Ash box
Mounting the ash box
The assembly of the ash box depends on the installa-
tion side of the pellet module. The installation side is
viewed from the insulation door towards the rear of the
boiler. Left means that the pellet module is installed on
the left side of the boiler.
1. Pellet module on the left side of the boiler:
2. Attach the seal and mount the ash duct to the ash
box. Note the alignment of the ash duct, see
graphic. Tighten the screws alternately and evenly.
Fig. 9-30: Ash duct (stoker on left)
3. Mount the flap on the ash duct. Do not tighten the
nut, so that the flap is still movable.
Fig. 9-31: Flap
Summary of Contents for 13180 LP-D
Page 1: ...2020 04 21 EN 0000000475 V 006 5402 00 939091 002 Pellet boiler ePE K 180 240 kW Installation ...
Page 33: ...Buffer storage tank Connection between multiple buffer storage tanks 33 ...
Page 55: ...Installation Network connection 55 ...
Page 61: ...Electrical connections Overview of circuit boards 61 ...
Page 65: ...Electrical connections Circuit board HA C5 65 ...
Page 85: ......
Page 86: ...www eta co at ...
Page 87: ......
Page 88: ...www eta co at www eta co at downloads DOWNLOAD ...