Installing the pellet bin
45
Inspect the stoker seal to ensure it is intact; replace it
if necessary.
Fig. 9-21: Seal
Place the pellet hopper over the stoker and lower
evenly with the aid of the levelling feet. Fasten the
pellet hopper to the stoker with nuts. Tighten the nuts
alternately and evenly.
Check the alignment of the pellet hopper and correct it
with the levelling feet, if necessary.
Fig. 9-22: Checking the alignment
Rotating the connections for pellet hoses
If required, the pellet hose connections can be rotated
by 90° or 180°. If this is necessary, carry out the
following steps.
1. Push up the rear cover and remove it.
Fig. 9-23: Cover
2. Dismantle the side panels.
Fig. 9-24: Side panels
Summary of Contents for 13180 LP-D
Page 1: ...2020 04 21 EN 0000000475 V 006 5402 00 939091 002 Pellet boiler ePE K 180 240 kW Installation ...
Page 33: ...Buffer storage tank Connection between multiple buffer storage tanks 33 ...
Page 55: ...Installation Network connection 55 ...
Page 61: ...Electrical connections Overview of circuit boards 61 ...
Page 65: ...Electrical connections Circuit board HA C5 65 ...
Page 85: ......
Page 86: ...www eta co at ...
Page 87: ......
Page 88: ...www eta co at www eta co at downloads DOWNLOAD ...