background image

2

1. EC declaration of conformity .................................. 2

2. WEEE Declarations ................................................... 2

3. Important - Please read first! .................................. 3

4. General characteristics............................................. 3

5. Scope of delivery ..................................................... 3

4.1. 54678 track «0» ...........................................................3

4.2. 54679 track «1» ...........................................................4

5. To install the smoke generator ............................... 5

5.1 Fill the system ................................................................5

5.2. Connection cable ..........................................................5

5.3. Following ESU decoders ................................................5

5.4. Connecting to other decoders (SUSI) .............................6

5.4.1. ZIMO MX695 / MX696 ..............................................6

5.4.2. Massoth eMotion XLS ................................................6

6. Programming the smoke generator ....................... 7

6.1. For ESU LokSound XL Decoder ......................................7

6.1.1. Basic settings .............................................................7

6.1.2. Sound synchronisation settings ..................................8

6.1.3. Optimization of the function ....................................11

6.1.4. Cylinder steam function ...........................................12

6.2. For other decoder (SUSI) .............................................12

6.2.1. Function key ............................................................12

6.2.2. Heating and fan speed monitoring ...........................12

6.3. Firmware update with LokProgrammer .......................13

7. Support and help ................................................... 13

8. List of SUSI-CVs ...................................................... 14

9. Guarantee certificate ............................................. 15

Contents

1. EC declaration of conformity

The manufacturer, ESU GmbH & Co. KG,

Edisonallee 29, D-89231 Ulm, hereby declares under sole

Responsibility that the product

Product name: 
Smoke Generator «Track 0» Smoke Generator «Track 1»
Type: 54678, 54679

EN 55014-1: 2006 + A1: 2009 Electromagnetic compatibility

- Requirements for household appliances, electric tools and similar 

Electrical equipment - Part 1: Emission
EN 55014-2: 1997 + A1: 2001 + A2: 2008: Electromagnetic

Compatibility  -  Requirements  for  household  appliances,  electric 

tools and similar electrical appliances - Part 2: Immunity.

2. WEEE Declarations

Disposal of old electrical and electronic equipment (applicable in 

the European Union and other European countries with separate 

collection systems). 
This symbol on the product, packaging or in the documentation 

indicates that this product may not be treated as household was-

te.  Instead  bring  this  product  to  the  appropriate 

collection  point  for  the  recycling  of  electrical  and 

electronic  devices.  If  the  product  is  disposed  of 

correctly, you will help to eliminate environmental 

influences and prevent damage to health caused by 

improper disposal. 

For more information about recycling of this product, please con-

tact your local city office, your household waste disposal service or 

the shop, where you purchased the product.

Summary of Contents for 54678

Page 1: ...Installation and Operating instructions 1 Edition March 2015 P N 01515 16039 54678 Smoke generator small 0 Gauge 54679 Smoke generator large G Gauge ESU Smoke Generator...

Page 2: ...roduct Product name Smoke Generator Track 0 Smoke Generator Track 1 Type 54678 54679 EN 55014 1 2006 A1 2009 Electromagnetic compatibility Requirements for household appliances electric tools and simi...

Page 3: ...cur 4 General characteristics The two ESU smoke generators provide realistic smoke and steam cloud to your models An integrated control operates both the fan motor and the heating of the smoke generat...

Page 4: ...meter for cylinder steam elbow to deflect the smoke flow to the cylinders Suitable screws headers Scope of delivery If you want to use the smoke generator as a steam cylinder all you have to do is rem...

Page 5: ...cannot damage the smoke generator Always fill the system on a flat surface never on a slanted surface Turn overfilled locomotives upside down to allow excess to drain in order to prevent leakage of s...

Page 6: ...6 The SUSI connector of the module as a usual coder is connected directly to the disassembly As for the connected coder use assem bly shown with the parts provided For this initial work the CVs have t...

Page 7: ...s however imperative to have a LokProgrammer 53451 53452 because you need to change settings in the sound sequencing You must first change the desired sound project load it into the LokProgrammer and...

Page 8: ...done in register Function assignment In the mapping line of the desired function key the logical function ESU smoke generator could be selected In our example this is the F4 key 6 1 2 Sound synchronis...

Page 9: ...ties change interactively depending on what was in the tile marked on the top right Transitions are triggered by a white rectangle shown Click with your mouse the Stop as in the shown figure To adjust...

Page 10: ...eam boost Not set The actual speed steps in all ESU projects with Dx referred to Some sound projects include D1 to D4 other go to D8 These are the normal bursts of steam Here you should experiment wit...

Page 11: ...he power cycle on Adjusting the fan speed Here the fan speed will be changed rela tive to the values set in the sound sequencing Adaptation of the heating temperature Here the heating tem perature wil...

Page 12: ...on the decoder The flue settings can be written together with the sound data 6 2 For other decoder SUSI When operating with other decoders from the SUSI interface usually only the current speed and t...

Page 13: ...s where they are located These two connections to the output must be connected to the LokProgrammer 7 Support and help If you do not know how to proceed first contact your dealer whe re you purchased...

Page 14: ...ty and all other Rights reserved Electrical and me chanical measurements and pictures without guarantee Any liability for consequential damages due to improper Use non compliance with these instructio...

Page 15: ...the enclosed failure report card as detailed and precise as possible and return it with your faulty product Please use the appropriate postage when shipping to ESU Extend of warranty exclusions This w...

Page 16: ...l system ESU ECoS M rklin 6012 ROCO Digital LGB Digital LGB MZS Intellibox Lenz Digital Others 3 Error description Headlight output front No Sound Cable Headlight output rear Wrong Sound Changedirecti...

Reviews: