Page 11 of 41
2
Installation
2.1 Annoucements before installation
Power supply must be off during installation and wiring.
Serious damage to the equipment may be caused by misconnection of
power supply terminals, improper connection of in-out lines and output
line short circuit. Therefore, before turning on the power supply, check
the connection of input output grounding and power supply wire. .
Grounding terminal of E21S shear
numerical
control device must be
grounded in correct way, with low impedance lower than 0.3
Ω
.
Do not dismantle the device without authorization so as to avoid
malfunction.
Electrical components inside the digital device are very sensitive to static
electricity, therefore do not put foreign matters or make them fall to the
inside of digital control device or touch the control circuit.
Please install E21S shear
numerical
control device in safe region. Avoid
high temperature, and direct sunlight, moisture and splash of oil drops or
water.
Do not use this device in place of high temperature, moisture
condensation, dust, oil smoke, conductive dust, corrosive gas or
flammable gas.
2.2 Installation space and direction
Generally, E21S shear
numerical
control device is embedded on control panel,
keep a distance of 65mm from its neighboring components and damper (shell)
on up and down, right and left, to facilitate operator install and maintain the
device.
2.3 Installation environment
Place free from water, vapor, dust or oily dust.
Place free from flammable, explosive or corrosive gas.
Place free from interference of strong electromagnetism or noise.
Summary of Contents for E21S
Page 2: ......
Page 4: ......
Page 30: ...Page 30 of 41 Figure 5 8 LCD diagnosis page...
Page 34: ......
Page 41: ...Page 41 of 41 Figure 7 4 Demonstration of AC asynchronism motor wiring...