ELECTRONIC CONTROL PANEL
Page 9
PROGRAMMING INSTRUCTIONS –
INSTALLER
Before entering the programming mode, make sure that
the control valve is in the service mode.
1.
Press the scroll button; the display will show:
Press the up
or down
button to set the
language.
2.
Press the scroll button again; the display will show:
Press the up
or down
button to set the time of
day.
3.
Press the scroll button again; the display will show:
Press the up or down button to set the number
of days between regenerations.
The regeneration cycle is necessary to prevent ‘caking’
of the filter media during the service cycle, which may result
in an increase of pressure drop over the water filter. Typically
a regeneration every 7 days should be sufficient. In case of
high flow rates, excessive water usage or a high
concentration of impurities in the incoming water, it may be
necessary to lower the number of days between
regenerations.
Language:English
Set time: 20:51
Interval:7 Days
Summary of Contents for pHneutralizer Series
Page 11: ...Page 11 ...
Page 14: ...HYDRAULIC FLOW DIAGRAMS Page 14 SERVICE BACKWASH PURGE ...
Page 18: ...EXPLODED VIEW SYSTEM Page 18 ...
Page 20: ...EXPLODED VIEW TIMER HEAD Page 20 ...
Page 22: ...EXPLODED VIEW VALVE BODY Page 22 ...
Page 25: ... 2012 Aquion Inc PP Neutralizer Rev2014 03 r 1 a r 1 b 2 a 2 b 3 a 3 b ...
Page 26: ... 2012 Aquion Inc PP Neutralizer Rev2014 03 r 4 a r 4 b 5 r 6 a r 6 b ...
Page 27: ... 2012 Aquion Inc PP Neutralizer Rev2014 03 r 6 c 7 a 7 b r 7 c ...
Page 28: ... 2012 Aquion Inc PP Neutralizer Rev2014 03 r 8 ...