
EPSON Stylus Pro 9500
Revision A
Maintenance & Setup
Unpacking and Installing
225
6.2.3 Unpacking and Assembling
FROM UNPACKING TO ASSEMBLING THE STAND
1.
Remove the band connecting the large box and medium size box, and take
out the medium size box.
2.
Open the medium size box and verify the contents. (See the previous
page.)
3.
Install the top and bottom horizontal stand supports (holes facing correct
direction) to the right-side leg and temporarily secure the top support with
the hexagonal bolts (M6 x 10). Repeat for the left-side leg
4.
Turn over the stand so that the bottom faces up. Then, connect the bottom
support and secure the support with the hexagonal bolts (M6 x 30).
5.
Turn over the assembled stand again, and completely secure the top-
support bolts.
Figure 6-2. Stand Assembly 1
Figure 6-3. Stand Assembly 2
C A U T I O N
n
It is recommended at least two people (four for
printer body) unpack and assemble the stand.
(Weight of stand: approximately 22kg after
assembling.)
n
Perform unpacking and assembly in a stable, open
place (about 4 x 4m).
C H E C K
P O I N T
Make sure the four holes on the upper support are on
the left when facing the rear and on the right when
facing the front.
Summary of Contents for Stylus Pro 9500 Engine
Page 6: ...C H A P T E R PRODUCTDESCRIPTION ...
Page 43: ...C H A P T E R OPERATINGPRINCIPLES ...
Page 69: ...C H A P T E R TROUBLESHOOTING ...
Page 82: ...C H A P T E R DISASSEMBLY ASSEMBLY ...
Page 155: ...C H A P T E R ADJUSTMENT ...
Page 219: ...C H A P T E R MAINTENANCE SETUP ...
Page 232: ...C H A P T E R APPENDIX ...
Page 250: ...PSON Stylus Pro 9500 Revision A ppendix Exploded view Diagram 250 Figure 7 3 R Frame Assembly ...
Page 251: ...PSON Stylus Pro 9500 Revision A ppendix Exploded view Diagram 251 Figure 7 4 PF Rail Assembly ...
Page 252: ...PSON Stylus Pro 9500 Revision A ppendix Exploded view Diagram 252 Figure 7 5 CR Rail Assembly ...
Page 253: ...PSON Stylus Pro 9500 Revision A ppendix Exploded view Diagram 253 Figure 7 6 CR Assy ...
Page 254: ...PSON Stylus Pro 9500 Revision A ppendix Exploded view Diagram 254 Figure 7 7 Maintenance Assy ...
Page 255: ...PSON Stylus Pro 9500 Revision A ppendix Exploded view Diagram 255 Figure 7 8 I H Assy Left ...
Page 256: ...PSON Stylus Pro 9500 Revision A ppendix Exploded view Diagram 256 Figure 7 9 I H Assy Right ...
Page 257: ...PSON Stylus Pro 9500 Revision A ppendix Exploded view Diagram 257 Figure 7 10 I H Assy 1 ...
Page 258: ...PSON Stylus Pro 9500 Revision A ppendix Exploded view Diagram 258 Figure 7 11 I H Assy 2 ...
Page 259: ...PSON Stylus Pro 9500 Revision A ppendix Exploded view Diagram 259 Figure 7 12 Tube Assembly ...
Page 260: ...PSON Stylus Pro 9500 Revision A ppendix Exploded view Diagram 260 Figure 7 13 Board Assembly ...
Page 261: ...PSON Stylus Pro 9500 Revision A ppendix Exploded view Diagram 261 Figure 7 14 Cover Assembly ...
Page 265: ......
Page 266: ......