
EPSON Stylus Pro 9500
Revision A
Disassembly & Assembly
Disassembly Flow
136
AFFIXING LABELS
1.
Affix the following labels in the specified locations.
n
EPSON _COLOR FAST Label
Affix this label on the right front of the H top cover.
n
Manual Cutter Cutting Position Labels
Horizontal Position: Align the scissors cutting line on the label with a
position 10 cm down from the bottom edge of the sub-
platen.
Vertical Position:
Align the label along the same line as the sub-platen’s
right edge.
n
Right Ink Cartridge Model No. Label
Affix the right ink cartridge Model No. label over top the dye based
ink label.
n
Left Ink Cartridge Model No. Label
Affix the left ink cartridge Model No. label over top the dye based ink
label.
For details, see the figure below.
Figure 4-97. Label Affixing Positions
PIGMENT INK INITIAL FILLING
1.
Take the 6 pigment ink cartridges from the conversion kit and set them in
the I/H holders. Lower the ink lever securely.
2.
Insert the AC cable in the outlet.
3.
When the printer’s power switch is turned on, the initial filling sequence will
start automatically. Approximately 7 minutes is necessary to complete this
sequence. The main initial filling flag starts based on the flag set in the “Ink
Discharge Procedure” on page 124.
Sub-platen
10cm
EPSON COLOR FAST
Summary of Contents for Stylus Pro 9500 Engine
Page 6: ...C H A P T E R PRODUCTDESCRIPTION ...
Page 43: ...C H A P T E R OPERATINGPRINCIPLES ...
Page 69: ...C H A P T E R TROUBLESHOOTING ...
Page 82: ...C H A P T E R DISASSEMBLY ASSEMBLY ...
Page 155: ...C H A P T E R ADJUSTMENT ...
Page 219: ...C H A P T E R MAINTENANCE SETUP ...
Page 232: ...C H A P T E R APPENDIX ...
Page 250: ...PSON Stylus Pro 9500 Revision A ppendix Exploded view Diagram 250 Figure 7 3 R Frame Assembly ...
Page 251: ...PSON Stylus Pro 9500 Revision A ppendix Exploded view Diagram 251 Figure 7 4 PF Rail Assembly ...
Page 252: ...PSON Stylus Pro 9500 Revision A ppendix Exploded view Diagram 252 Figure 7 5 CR Rail Assembly ...
Page 253: ...PSON Stylus Pro 9500 Revision A ppendix Exploded view Diagram 253 Figure 7 6 CR Assy ...
Page 254: ...PSON Stylus Pro 9500 Revision A ppendix Exploded view Diagram 254 Figure 7 7 Maintenance Assy ...
Page 255: ...PSON Stylus Pro 9500 Revision A ppendix Exploded view Diagram 255 Figure 7 8 I H Assy Left ...
Page 256: ...PSON Stylus Pro 9500 Revision A ppendix Exploded view Diagram 256 Figure 7 9 I H Assy Right ...
Page 257: ...PSON Stylus Pro 9500 Revision A ppendix Exploded view Diagram 257 Figure 7 10 I H Assy 1 ...
Page 258: ...PSON Stylus Pro 9500 Revision A ppendix Exploded view Diagram 258 Figure 7 11 I H Assy 2 ...
Page 259: ...PSON Stylus Pro 9500 Revision A ppendix Exploded view Diagram 259 Figure 7 12 Tube Assembly ...
Page 260: ...PSON Stylus Pro 9500 Revision A ppendix Exploded view Diagram 260 Figure 7 13 Board Assembly ...
Page 261: ...PSON Stylus Pro 9500 Revision A ppendix Exploded view Diagram 261 Figure 7 14 Cover Assembly ...
Page 265: ......
Page 266: ......