
EPSON Stylus Pro 9500
Revision A
Disassembly & Assembly
Disassembly Flow
151
7.
Raise the paper set lever, then set a sheet of A3 size plain copy paper
(PPC paper) in the paper path, then lower the paper set lever to fix the
paper in position. At this time, make sure the front edge of the sheet of
paper is at the paper front edge setting position on paper guide L.
8.
Move the CR unit over the paper and close the front cover halfway. At this
time, if the vvv value in the LCD display does not change, the subsequent
operation can be performed with the front cover in the open state. If the vvv
value changes, use adhesive tape, etc. to fix the front cover in the half
closed state.
NOTE:
NOTE: Move the CR unit over the paper so that the CR unit’s right
edge is aligned with the paper’s right edge.
9.
Confirm that the LCD displays the following.
n
LCD Display: “Sen: Edge AD ttt vvv”
n
ttt value: 040<H> or higher
n
vvv value: 0A0<H> ~ 0E0<H>.
If the vvv value in the LCD display is not within the 0A0<H> ~ 0E0<H>
range, adjust VR1 while checking the value of vvv displayed in the LCD.
10. Return the CR unit to the HP position.
11. Raise the paper set lever, then after removing the paper, return the paper
set lever to the paper set position.
12. Press the [Paper Source] button and move the next adjustment mode.
o
P-FRONT Sensor Adjustment
1.
Confirm that “Sen: FRONT AD ttt vvv” is displayed in the LCD and that the
front cover is in the closed state.
2.
Confirm that the following is displayed in the LCD.
n
LCD Display: “Sen: FRONT AD ttt vvv”
n
ttt value: The numerical value is not related to anything.
n
vvv value: Should be a value 025<H> or lower.
If the vvv value is higher than 025<H>, adjust the VR2 element so that the
vvv value is 025<H> or lower.
3.
Raise the paper set lever, then set a sheet of A3 size plain copy paper
(PPC paper) in the paper path along the roll paper cover’s guide, then
lower the paper set lever to fix the paper in position. At this time, make sure
the front edge of the sheet of paper is at the paper front edge setting
position on paper guide L.
4.
Close the front cover halfway. At this time, if the vvv value in the LCD
display does not change, the subsequent operation can be performed with
the front cover in the open state. If the vvv value changes, use adhesive
tape, etc. to fix the front cover in the half closed state.
NOTE:
Move the CR unit over the paper so that the CR unit’s right edge is
aligned with the paper’s right edge.
5.
Confirm that the LCD displays the following.
n
LCD Display: “Sen: FRONT AD ttt vvv”
n
ttt value: 040<H> or higher
n
vvv value: 0A0<H> ~ 0E0<H>.
If the vvv value in the LCD display is not within the 0A0<H> ~ 0E0<H>
range, adjust VR2 while checking the value of vvv displayed in the LCD.
6.
Raise the paper set lever, then after removing the paper, return the paper
set lever to the paper set position.
7.
Press the [Paper Source] button and move the next adjustment mode.
Summary of Contents for Stylus Pro 9500 Engine
Page 6: ...C H A P T E R PRODUCTDESCRIPTION ...
Page 43: ...C H A P T E R OPERATINGPRINCIPLES ...
Page 69: ...C H A P T E R TROUBLESHOOTING ...
Page 82: ...C H A P T E R DISASSEMBLY ASSEMBLY ...
Page 155: ...C H A P T E R ADJUSTMENT ...
Page 219: ...C H A P T E R MAINTENANCE SETUP ...
Page 232: ...C H A P T E R APPENDIX ...
Page 250: ...PSON Stylus Pro 9500 Revision A ppendix Exploded view Diagram 250 Figure 7 3 R Frame Assembly ...
Page 251: ...PSON Stylus Pro 9500 Revision A ppendix Exploded view Diagram 251 Figure 7 4 PF Rail Assembly ...
Page 252: ...PSON Stylus Pro 9500 Revision A ppendix Exploded view Diagram 252 Figure 7 5 CR Rail Assembly ...
Page 253: ...PSON Stylus Pro 9500 Revision A ppendix Exploded view Diagram 253 Figure 7 6 CR Assy ...
Page 254: ...PSON Stylus Pro 9500 Revision A ppendix Exploded view Diagram 254 Figure 7 7 Maintenance Assy ...
Page 255: ...PSON Stylus Pro 9500 Revision A ppendix Exploded view Diagram 255 Figure 7 8 I H Assy Left ...
Page 256: ...PSON Stylus Pro 9500 Revision A ppendix Exploded view Diagram 256 Figure 7 9 I H Assy Right ...
Page 257: ...PSON Stylus Pro 9500 Revision A ppendix Exploded view Diagram 257 Figure 7 10 I H Assy 1 ...
Page 258: ...PSON Stylus Pro 9500 Revision A ppendix Exploded view Diagram 258 Figure 7 11 I H Assy 2 ...
Page 259: ...PSON Stylus Pro 9500 Revision A ppendix Exploded view Diagram 259 Figure 7 12 Tube Assembly ...
Page 260: ...PSON Stylus Pro 9500 Revision A ppendix Exploded view Diagram 260 Figure 7 13 Board Assembly ...
Page 261: ...PSON Stylus Pro 9500 Revision A ppendix Exploded view Diagram 261 Figure 7 14 Cover Assembly ...
Page 265: ......
Page 266: ......