Part 2: Maintenance
13. Protected Model Maintenance
205
Name Specification
NOTE
A
Silicon Rubber
Sheet
A sheet of 1 mm-thick silicon
rubber to be used for sealing
covers with liquid gasket
Make sure the rubber sheet has
been sealed up with the cover all
around by tightening the bolts
on the cover. Do not fasten the
bolts too tight. Fastening too
tight may cause the rubber to be
bulged out or torn.
B
Rubber
Packing
A ring-shaped rubber packing
to be applied on the duct joint
with liquid gasket
This packing does not need to
be detached when you follow
the maintenance operation
method described in this
manual.
Make sure that the rubber
packing has been sealed up.
Do not screw the duct joint too
tight. Screwing the joint too
tight may cause the rubber to be
bulged out or torn.
C
O-ring packing A rubber packing to be applied
on bellows, flange of reduction
gear, encoder reset cover and
main cable elbow fitting.
Make sure that the rings are not
squeezed nor deformed.
D
*Liquid gasket The liquid gasket supplied with
the manipulator to be applied
on the cover, plate, duct joint,
cable bracket, bolts, cable seal
box, and receptacle.
When using for covers, plates
and duct joint, apply the gasket
on its joint after installing the
cover, plate or duct joint.
When using for cable bracket,
bolts, cable seal box and
receptacle, apply the gasket on
one of the surfaces to be put
together before assembling.
Wipe the surplus.
The gasket dries in about 30
minutes and becomes rubbery in
15 to 16 hours in normal
temperature. For more details,
refer to the instructions printed
on the liquid gasket box.
*The liquid gasket for protected model is different from the gasket for standard and
clean model. Use the liquid gasket (1212).
Summary of Contents for EL Series
Page 1: ...ES EL series Rev 9 EM019R893F SCARA ROBOT MANIPULATOR MANUAL ...
Page 2: ...MANIPULATOR MANUAL ES EL series Rev 9 ...
Page 12: ...x ...
Page 14: ...2 ...
Page 16: ...1 Manipulator Part Names Part 1 Setup Operation 4 ...
Page 30: ...4 User Wires and Pneumatic Tubes Part 1 Setup Operation 18 ...
Page 42: ...5 End Effectors Part 1 Setup Operation 30 ...
Page 44: ...6 Attaching a Camera Valve and Other Devices Part 1 Setup Operation 32 ...
Page 68: ...8 Motion Range and Robot Coordinates Part 1 Setup Operation 56 ...
Page 70: ...9 Emergency Stop Part 1 Setup Operation 58 ...
Page 80: ...11 Clean Model Part 1 Setup Operation 68 ...
Page 92: ...80 ...
Page 94: ...Maintenance Safety Precautions Part 2 Maintenance 82 ...
Page 104: ...2 Opening the Covers Part 2 Maintenance 92 ...
Page 112: ...3 Replacing the Cable Unit Part 2 Maintenance 100 ...
Page 138: ...5 Replacing the Motors Part 2 Maintenance 126 ...
Page 162: ...6 Replacing the Reduction Gear Units Part 2 Maintenance 150 ...
Page 186: ...9 Replacing the Ball Screw Spline Unit Part 2 Maintenance 174 ...
Page 210: ...11 Calibration Part 2 Maintenance 198 ...
Page 214: ...12 Clean Model Maintenance Part 2 Maintenance 202 ...
Page 224: ...13 Protected Model Maintenance Part 2 Maintenance 212 13 6 Wiring Schematic 2 ...
Page 236: ...14 Maintenance Part Lists Part 2 Maintenance 224 ...