EPSON AcuLaser C1900/AcuLaser C900
Revision B
Disassembly and Assembly
Printer Main Parts Disassembly and Assembly
190
4.5.9 Rack Motor (M2)
1.
Remove the Cleaner Pressure Flapper Solenoid (SL4). (p.189)
2. Remove the cam inside the printer body (1 E-ring) and remove the Rack Drive Assy. (5
screws, 2 sets of harness)
(See
“Figure 4-29 (p.190)”)
3. Remove the shaft of the Rack Clutch and remove the Drive Gear.
(1 E-ring)
(See
“Figure 4-30 (p.190)”)
4. Remove the Rack Motor (2 screws)
(See
“Figure 4-31 (p.190)”)
Figure 4-29. Removing the Rack Drive Assy
Figure 4-30. Removing the Drive Gear
Figure 4-31. Removing the Rack Motor
Summary of Contents for AcuLaser C1900
Page 1: ...EPSON AcuLaserC1900 AcuLaserC900 A4 Color Page Printer SERVICE MANUAL ROSCO SEPG02003 ...
Page 21: ...C H A P T E R 1 PRODUCTDESCRIPTION ...
Page 87: ...C H A P T E R 2 OPERATINGPRINCIPLES ...
Page 122: ...C H A P T E R 3 TROUBLESHOOTING ...
Page 166: ...C H A P T E R 4 DISASSEMBLYANDASSEMBLY ...
Page 208: ...C H A P T E R 5 ADJUSTMENT ...
Page 217: ...C H A P T E R 6 MAINTENANCE ...
Page 219: ...C H A P T E R 7 APPENDIX ...
Page 260: ......
Page 261: ......
Page 262: ......
Page 263: ......
Page 264: ......
Page 265: ......
Page 266: ......
Page 267: ......
Page 268: ......
Page 269: ......
Page 270: ......