27
EN
Wiring diagram and connections
9.0 kW
To be connected by a qualified electrician:
Drill an approx. 10 mm hole in the cabin wall near the entry area of the stove‘s connecting cable.
Feed the connecting cable through the borehole to the outside and connect to the power supply
in a distribution box suitable for wet rooms.
Please observe the wiring diagram and the regulations of the local power supplier (TAB 2000) and
the legal norms.
Caution!
An adequate fuse and a mains circuit breaker must be installed in the stove‘s
power supply line on site.
400 V 3N AC
5 x 1,5²
max. 10 m
6,0 kW = 3x 2000 W
7,5 kW = 3x 2500 W
9,0 kW = 3x 3000 W
L1L2L3
N
5 x 2,5²
Leuchte
A
bsicherung
Hauptschalt
er
Ver
teiler
dose
bauseitige Installation
L1
A1
A2
A3
L2 L3 N N
B1
B2
B3
Thermostat
M
N PE
Zeitschaltuhr
timer
Thermostat
reset
A1
A1
B1
B
A
A
Schutztemperatur-
begrenzer (STB)
overheating
protection fuse
Attention! Always connect the neutral wire N.
Fuses
Main swit
ch
Junc
tion bo
x
Light
Summary of Contents for Moment W
Page 2: ...2 Deutsch 3 English 21 39...
Page 39: ...39 RU 40 40 41 43 45 45 46 47 47 51 52 53 54 55 56...
Page 40: ...40 RU DIN EN ISO 9001 2015 110 C 30 40 C 110 C 20 25 85 C 80 90 C 76 C...
Page 41: ...41 RU 8 VDE 0100 49 DA 6 VDE 0100 703 2006 2 5 10...
Page 42: ...42 RU DIN EN VDE 0100 T 703 40 170 C...
Page 43: ...43 RU 76 C...
Page 44: ...44 RU...
Page 47: ...47 RU 1 90 90 1 1 2 2 8 cm 33 cm 8 cm 44 cm 8 cm...
Page 48: ...48 RU 4 3 2 3 4 360 430 180 180 Ma e in mm 2 min 120...
Page 49: ...49 RU 6 2 6 7 5 7 5 4 2 x 9 5...
Page 50: ...50 RU 8 6 M4 8 60 cm 22 cm 4 cm...
Page 51: ...51 RU 45 60 40 100 C 15 C 9 4 30 0 0 0 min max 0 1 2 1 1 2 1 2 2 3 1 2 4...
Page 52: ...52 RU 10 STB 10 STB 30...
Page 53: ...53 RU 100 10...
Page 56: ...56 RU ASB I II III IV V VI 24 www eos sauna com agb 08 2018...