www.enware.com.au
Call 1300 369 273
11
AFTER THE WALL IS FINISHED
1. Once the finished wall is complete, the protruding section
of the box needs to be trimmed so it finishes flush with
the front of the wall face. Discard the cover.
2. Fit the chrome back support bracket.
3. Take the chrome cylindrical dress sleeve and push it onto
the mixer body ensuring the O-rings on the mixer body
are greased.
4. Fit the face plate over the chrome sleeve and secure
using 4 x M4 screws supplied.
5. Take the chrome flange, lightly grease the O-ring and
push over the chrome dress sleeve until it is hard up
against the face plate.
6. Screw the brass spline connector into the top of the
mixer cartridge
7. Fit the handle over the spline connector.
8. Insert the M5 fixing pin into the side of the handle and
tighten making sure you are left with no movement in
the handle. If the pin does not screw in all the way or the
handle has movement, remove the handle and adjust
the spline connector, then re-fit the M5 fixing pin.
9. The valve can now be commissioned.
Commission the valve as per the instructions on page
19, and complete commissioning report on page 26.
IMAGE 11
Extra Components Supplied:
•
1x Large Plug for Body (in place of SQX
Thermostatic Cartridge during servicing)
•
2x Small Plugs for inlets (in place check valve
strainer assemblies during servicing)
Spline Adaptor
Flange
Back Support
Bracket
Summary of Contents for AQUABLEND SQX ATM606
Page 28: ......