8
Call 1300 369 273
www.enware.com.au
IMAGE 1
IMAGE 2
IMAGE 3
INSTALLATION PROCEDURE
IN WALL
STEP 1
Determine the desired location for the box with
relation to the spout height off the basin. AUSHFG
specifies the spout should be 1120mm off finished
floor level.*
*Recommended height of spout (point of water discharge) for
Type A and Type B Clinical Hand Washing Bay is 1120mm off
finished floor level when combined with basin at a height of
865mm, according to AUSHFG (Australasian Health Facility
Guidelines).
STEP 2
If installing within a frame wall, fit mounting timber
in the desired location for box support. Enware
recommend 13mm ply wood fixed between two
vertical in wall studs.
NOTE
: plywood needs to cover the entire back
section of the box, so the valve body can be fixed.
(Refer to STEP 6)
IMPORTANT
: The depth of box from finished
wall to the back of the box must be between
85-100mm
STEP 3
Mark out the fixing point locations while ensuring
the box is level. The spirit level inside the box can
be seen through the top access hole.
SEE IMAGE 1
STEP 4
Secure the eSQX™ box to the ply wood support
using the external fixing lugs and adequate fixing
screws. SEE IMAGE 2
STEP 5
Remove front dust cover. Keep the dust cover and
4 screws at hand
STEP 6
Secure eSQX™ brass body to the mounting timber
using stainless steel screws supplied.
SEE IMAGE 3