
26
Call 1300 369 273
www.enware.com.au
STEP 1
To access the inspection ports, the thermostatic valve must
first be closed and spout, dress flange and the faceplate
removed as per Step 1 (A-D) Annual Maintenance Procedure.
SEE IMAGES 1A, 1B, 1C, 1D on page 21.
STEP 2
Using an M6 Allen key, unwind the access cover and keep at
hand. SEE IMAGE 45
STEP 3
Apply thread tape or equivalent to a Pete’s Plug (Enware
part - ATMS1221) and thread into the 1/4” thread port.
SEE IMAGE 46
STEP 4
Insert measurement probe into Pete’s Plug and open isolation
valves. Check for leaks. SEE IMAGE 47
STEP 5
Operate the mixer and conduct in-service tests as required.
ACCESS TO INSPECTION PORTS
As prescribed in AS4032.3, it is necessary to record the hot and cold supply temperatures and pressures
during commissioning. This can be done easily with the integral inspection ports located on each inlet
connector.
SEE IMAGE 45
Prior to servicing the mixer, ensure the hot and cold water supplied are isolated via the integral isolation
valves located within each inlet connector
SEE IMAGE 26
on page 19.
IMAGE 45
IMAGE 46
IMAGE 47
SERVICE AND MAINTENANCE