P a g e
|
59
3)
Once the correct ID is selected the user should tap
the “Purge” button. The
sample pump will
turn on and the button will turn green. The timer will count down 90 seconds or until the O
2
percent in the meter is at least 18% then the pump will turn off. The purge cycle may end if
either the Envision® meter detects that the sample train is clear of methane or the user taps
the “Purge” button again
.
Summary of Contents for ENV100
Page 1: ...865 West Liberty Suite 220 Medina Ohio April 2018 Envision Landfill Gas Analyzer...
Page 15: ...P a g e 15 3 Tap Settings 4 Next tap System 5 Next tap Backlight...
Page 22: ...P a g e 22 2 Tap System and then External GPS 3 Verify GPS program port is set to COM 3...
Page 36: ...P a g e 36 2 Tap the Disconnect button...
Page 42: ...P a g e 42...
Page 105: ...P a g e 105 3 Tap the Clear Site button...
Page 139: ...P a g e 139...
Page 155: ...P a g e 155 5 Name the handheld PC 6 The handheld device will then Sync with the desktop PC...