Completing the Installation
3-24 Installation
Completing the Installation
Completing
the
DFE
module
installation
depends
on
if
the
module
is
being
installed
in:
•
a
new
DFE
module
system
(refer
to
“
Completing
the
Installation
of
a
New
System
”
on
page 3
‐
25),
or
•
an
established,
operating
DFE
module
system
(refer
to
“
Completing
the
Installation
of
a
DFE
Module
in
an
Existing
System
”
on
page 3
‐
26).
VT Series Port Adapter Wiring and Signal Diagram
RJ45
DB25
Pin
Conductor
Pin
Signal
4
Red 2
Transmit
(TX)
1
Blue
3
Receive (RX)
6
Yellow
5
Clear to Send (CTS)
5
Green 7
Ground
(GRD)
2
Orange
20
Data Terminal Ready
Modem Port Adapter Wiring and Signal Diagram
RJ45
DB25
Pin
Conductor
Pin
Signal
1
Blue
2
Transmit (TX)
2
Orange
8
Data Carrier Detect (DCD)
4
Red
3
Receive
5
Green 7
Ground
(GRD)
6
Yellow
20
Data Terminal Ready (DTR)
8
Gray
22
Ring Indicator
RJ45 Connector (Female)
8
1
Pins
DB25 Connector (Female)
Pins
1
13
14
25
RJ45 Connector (Female)
Pins
8
1
045905
RJ45 Connector (Female)
8
1
Pins
DB25 Connector (Male)
13
1
Pins
14
25
Summary of Contents for Matrix 7GR4202-30
Page 2: ......
Page 14: ...xii...
Page 30: ...XENPAK 10 Gigabit Ethernet 2 4 Network Requirements...
Page 58: ...Completing the Installation 3 28 Installation...
Page 66: ...Last Resort Shutdown Procedure 4 8 Troubleshooting...
Page 74: ...Regulatory Compliance A 8 Specifications...
Page 84: ...Memory Locations and Replacement Procedures B 10 Mode Switch Settings and Installing Options...