Installing an Optional XENPAK Module
3-6 Installation
Installing an Optional XENPAK Module
This
section
describes
how
to
install
a
XENPAK
module
into
the
7KR4290
‐
02
DFE
module.
For
the
XENPAK
specifications,
refer
to
Appendix A
.
Preparation
Before
installing
the
XENPAK
module,
proceed
as
follows:
1.
Attach
the
antistatic
wrist
strap
(refer
to
the
instructions
in
the
antistatic
wrist
strap
package)
before
removing
the
XENPAK
module
from
the
antistatic
packaging.
2.
Remove
the
XENPAK
module
from
the
packaging.
Installation
To
install
a
XENPAK
module,
refer
to
Figure 3
‐
4
and
proceed
as
follows:
1.
Hold
the
XENPAK
module
with
the
top
side
facing
up
(as
shown
in
Figure 3
‐
4
)
and
its
edge
connector
facing
the
port
slot.
2.
Carefully
align
the
XENPAK
module
with
the
port
slot.
3.
Push
the
XENPAK
module
into
the
7KR4290
‐
02
port
slot
until
the
back
of
the
XENPAK
module
faceplate
is
flush
against
the
7KR4290
‐
02
front
panel.
4.
Turn
the
two
thumbscrews
clockwise
and
tighten
to
secure
the
XENPAK
module
to
the
front
panel.
This
completes
the
XENPAK
module
installation.
Caution:
Carefully follow the instructions in this manual to avoid damaging the XENPAK module
and 7KR4290-02.
The XENPAK module
and 7KR4290-02
are sensitive to static discharges. Use an antistatic wrist
strap and observe all static precautions during this procedure. Failure to do so could result in
damage to the XENPAK module and 7KR4290-02. Always leave the XENPAK module in the
antistatic bag or an equivalent antistatic container when not installed.
Precaución:
Siga las instrucciones del manual para no dañar el XENPAK ni el módulo
7KR4290-02, puesto que son muy sensible a las descargas de electricidad estática. Utilice la
pulsera antiestática y tome todas las precauciones necesarias durante este procedimiento. Si no lo
hace, podría dañar el XENPAK ni el módulo 7KR4290-02. Mientras no esté instalado, mantenga el
XENPAK en su bolsa antiestática o en cualquier otro recipiente antiestático.
Summary of Contents for Matrix 7GR4202-30
Page 2: ......
Page 14: ...xii...
Page 30: ...XENPAK 10 Gigabit Ethernet 2 4 Network Requirements...
Page 58: ...Completing the Installation 3 28 Installation...
Page 66: ...Last Resort Shutdown Procedure 4 8 Troubleshooting...
Page 74: ...Regulatory Compliance A 8 Specifications...
Page 84: ...Memory Locations and Replacement Procedures B 10 Mode Switch Settings and Installing Options...