xi
3-10
Straight-Through 4-Wire Cable RJ45 Pinouts, Connections
Between Switches and End User Devices ....................................................................................... 3-15
3-11
Eight-Wire Crossover Cable RJ45 Pinouts, Connections Between Hub Devices ............................ 3-16
3-12
Eight-Wire Straight-Through Cable RJ45 Pinouts, Connections
Between Switches and End User Devices ....................................................................................... 3-16
3-13
Cable Connection to MT-RJ Fiber-Optic Connectors ....................................................................... 3-18
3-14
Cable Connection to LC Fiber-Optic Connectors ............................................................................. 3-19
3-15
Connecting an IBM PC or Compatible.............................................................................................. 3-21
3-16
Connecting a VT Series Terminal..................................................................................................... 3-22
3-17
Connecting to a Modem ................................................................................................................... 3-23
3-18
Matrix DFE Startup Screen Example (N7 Chassis) .......................................................................... 3-26
4-1
LANVIEW LEDs.................................................................................................................................. 4-2
4-2
OFFLINE/RESET Switch.................................................................................................................... 4-6
B-1
Mode Switch Location on 7GR4270-12..............................................................................................B-2
B-2
Mode Switch Location on 7GR4202-30..............................................................................................B-2
B-3
Mode Switch Location on the 7GR4280-19........................................................................................B-3
B-4
Mode Switch Location on the 7KR4290-02 ........................................................................................B-3
B-5
DIMM and DRAM SIMM Locations for 7GR4270-12 and 7GR4202-30 .............................................B-4
B-6
DIMM and DRAM SIMM Locations for 7GR4280-19..........................................................................B-4
B-7
DIMM and DRAM SIMM Locations for 7KR4290-02 ..........................................................................B-5
B-8
Removing the Existing DRAM SIMM..................................................................................................B-6
B-9
Installing the DRAM SIMM .................................................................................................................B-7
B-10
Removing the Existing DIMM .............................................................................................................B-8
B-11
Installing the DIMM.............................................................................................................................B-8
B-12
Removing the Optional Network Expansion Module (NEM)...............................................................B-9
Tables
2-1
Recommended Cable Types and Specifications................................................................................ 2-3
3-1
Contents of Module Carton................................................................................................................. 3-2
4-1
LANVIEW LEDs.................................................................................................................................. 4-2
4-2
Troubleshooting Checklist .................................................................................................................. 4-4
A-1
Specifications .....................................................................................................................................A-1
A-2
Mini-GBIC Input/Output Port Specifications .......................................................................................A-3
A-3
MGBIC-LC01 / MGBIC-MT01 Optical Specifications .........................................................................A-3
A-4
MGBIC-LC01 / MGBIC-MT01 Operating Range ................................................................................A-3
A-5
MGBIC-LC03 Optical Specifications...................................................................................................A-4
A-6
MGBIC-LC03 Operating Range..........................................................................................................A-4
A-7
MGBIC-LC09 Optical Specifications...................................................................................................A-4
A-8
MGBIC-LC09 Operating Range..........................................................................................................A-4
A-9
MGBIC-08 Optical Specifications .......................................................................................................A-5
A-10
MGBIC-08 Operating Range ..............................................................................................................A-5
A-11
MGBIC-02 / Specifications .................................................................................................................A-5
A-12
XENPAK Port, Physical, and Environmental Specifications...............................................................A-6
A-13
XENPAK Fiber-Optic Specifications ...................................................................................................A-6
A-14
Recommended Cable Types and Specifications................................................................................A-6
A-15
COM Port Pin Assignments................................................................................................................A-7
A-16
Compliance Standards .......................................................................................................................A-7
Summary of Contents for Matrix 7GR4202-30
Page 2: ......
Page 14: ...xii...
Page 30: ...XENPAK 10 Gigabit Ethernet 2 4 Network Requirements...
Page 58: ...Completing the Installation 3 28 Installation...
Page 66: ...Last Resort Shutdown Procedure 4 8 Troubleshooting...
Page 74: ...Regulatory Compliance A 8 Specifications...
Page 84: ...Memory Locations and Replacement Procedures B 10 Mode Switch Settings and Installing Options...