Mounting the Switch
Enterasys D-Series Hardware Installation Guide 2-21
Connecting Network Cabling and Attaching the Wire Relief Bracket
The
wire
relief
bracket
is
designed
to
hold
network
cables
securely
in
place
and
prevent
tampering
once
cabling
is
connected
to
switch
ports.
To
attach
the
wire
relief
bracket
to
the
lockbox
tray:
1.
Attach
network
cables
as
shown
in
Figure 2
‐
19
.
Refer
to
“
Connecting
to
the
Network
”
on
page 2
‐
28
for
more
information.
Figure 2-19 Attaching a Network Cable (UTP cable to RJ45 port shown)
2.
Align
the
wire
relief
bracket
with
the
flange
and
the
two
screw
holes
on
the
side
of
the
lockbox
tray
as
shown
in
Figure 2
‐
20
on
page 2
‐
22.
Summary of Contents for D2G124-12
Page 2: ......
Page 12: ...x ...
Page 16: ...xiv ...
Page 20: ...Getting Help xviii About This Guide ...
Page 26: ...PoE Power over Ethernet Support 1 6 Introduction ...
Page 66: ...Resetting the D2 HIPWR POE 3 4 Troubleshooting ...
Page 74: ...Regulatory Compliance A 8 Specifications ...
Page 76: ...Index 2 ...