Mounting the Switch
Enterasys D-Series Hardware Installation Guide 2-7
Figure 2-6 Positioning of Hook & Loop Straps to Secure Power Supply (edge of tray
shown)
2.
Repeat
step 1
on
page 2
‐
6
with
another
hook
&
loop
strap
to
secure
the
other
side
of
the
power
supply
to
the
mounting
tray.
Final
placement
is
shown
in
Figure 2
‐
7
.
Figure 2-7 Securing a Power Supply to the Rack Mount Tray (edge of tray position shown)
1
Top power supply mounting hole
4
Outer set of bridge anchors
2
Bottom power supply mounting hole
5
Inner set of bridge anchors
3
Hook & loop straps
1
Top power supply mounting hole
5
AC power cord
2
Bottom power supply mounting hole
6
Outer set of bridge anchors
3
Hook & loop straps
7
Inner set of bridge anchors
4
DC power cord
Summary of Contents for D2G124-12
Page 2: ......
Page 12: ...x ...
Page 16: ...xiv ...
Page 20: ...Getting Help xviii About This Guide ...
Page 26: ...PoE Power over Ethernet Support 1 6 Introduction ...
Page 66: ...Resetting the D2 HIPWR POE 3 4 Troubleshooting ...
Page 74: ...Regulatory Compliance A 8 Specifications ...
Page 76: ...Index 2 ...